9543
Provenance
5 results
Fields:
notes
| Fact | Field | Value | Latest Entry Date | |
|---|---|---|---|---|
| 2004033eadd50a3c58d3f3fc77e4dc67975c57ba724c7f74e54304e9ecd56daa | notes | Redundant waterworks facility within Tweedmouth now surplus to NWL requirements. Offers opportunity for redevelopment within the urban area. There is a covered reservoir and a pumping situation in situ. A proposal is likely to require clearance of some of this site infrastructure prior to redevelopment. A hybrid application was permitted in 2019 for a total of 10 dwellings (18/01164/OUT). This includes full consent for the conversion of the former pumping station to create 6 apartments and then 4 further new-build homes in outline. A detailed application is follow for the latter aspect due course. Development yet to commence but it has recently been confirmed that the works for conversion of the pumping station are to be commenced by May 2022. Outline permission for demolition of the reservoir and construction of 4 further units will follow. Completion of the overall project forecast within the next 5 years. | 2021-12-17 | |
| 365cf552bf6483d657ec57b01b9b182405b0bd73f7643c9c91ad7566e7133a94 | notes | Outline application for development of 10 homes currently pending consideration. Part of land under Site 10 - identified for allocattion in the Berwick Eastern Arc Issues and Options report (May 2010). Brownfield site within Tweedmouth which offers a good opportunity for redevelopment. Application currently awaiting determination.. https://www.northumberland.gov.uk/NorthumberlandCountyCouncil/media/Planning-and-Building/planning%20policy/Studies%20and%20Evidence%20Reports/Housing%20Studies/1.%20SHLAA/Appendix-G-SHLAA-Sites-Summary-Assessment-Schedule.pdf | 2018-12-31 | |
| 56b902633c2f98677c169e2b832340006514eeea2376eb98aecc0c81a0ba816a | notes | Redundant waterworks facility within Tweedmouth now surplus to NWL requirements. Offers opportunity for redevelopment within the urban area. There is a covered reservoir and a pumping station in situ and a proposal will require clearance of some of this site infrastructure prior to redevelopment. Whilst not listed, the pumping station is of architectural significance and could be retained, perhaps through a conversion scheme. A hybrid application was permitted in 2019 for a total of 10 dwellings (18/01164/OUT). This included full consent for the conversion of the former pumping station to create 6 apartments and then outline permission for 4 further new-build homes in outline. A detailed application would be needed prior to commencement of the new-build aspect of the scheme. However, no progress was made and the application lapsed. A revised application will need to be approved to enable progress. Following this deliverability can be reappraised, but at present it is considered developable in the medium-term (6-10 years). | 2024-12-11 | |
| 84e96b3de4670fe1447e43871f8152b9c57f217ded0228c119491f98d4b5fd50 | notes | Redundant waterworks site within Tweedmouth, with existing infrastructure remaining in situ, but which offers opportunity for redevelopment. A hybrid application was permitted in May 2019 for 6 dwellings (in full) with a further 4 (in outline) to follow (18/01164/OUT). This proposal will involve demolition of a reservoir and the former pumping station prior to new-build development. Given the recent approval of this application, no start has been made on residential development to date. | 2018-12-31 | |
| 9f5854e74e18845bca3a3ad145a76a002a689278b835b9d735e398911716d82a | notes | Redundant waterworks facility within Tweedmouth with existing infrastructure remaining in situ. Now surplus to NWL requirements and offers opportunity for redevelopment within the urban area. A proposal would require demolition of a disused covered reservoir and the former pumping station prior to redevelopment. A hybrid application was permitted in May 2019 for a total of 10 dwellings (18/01164/OUT). This includes 6 apartments with full consent and a further 4 units in outline. A detailed application will follow for the rest of the scheme in due course. Development yet to commence but forecast for completion with the next 5 years. | 2020-12-17 |