9543
Provenance

Filters

Field

1 selected

Field

Clear

5 results

Fields: notes
Fact Field Value Latest Entry Date
2004033eadd50a3c58d3f3fc77e4dc67975c57ba724c7f74e54304e9ecd56daa notes Redundant waterworks facility within Tweedmouth now surplus to NWL requirements. Offers opportunity for redevelopment within the urban area. There is a covered reservoir and a pumping situation in situ. A proposal is likely to require clearance of some of this site infrastructure prior to redevelopment. A hybrid application was permitted in 2019 for a total of 10 dwellings (18/01164/OUT). This includes full consent for the conversion of the former pumping station to create 6 apartments and then 4 further new-build homes in outline. A detailed application is follow for the latter aspect due course. Development yet to commence but it has recently been confirmed that the works for conversion of the pumping station are to be commenced by May 2022. Outline permission for demolition of the reservoir and construction of 4 further units will follow. Completion of the overall project forecast within the next 5 years. 2021-12-17
365cf552bf6483d657ec57b01b9b182405b0bd73f7643c9c91ad7566e7133a94 notes Outline application for development of 10 homes currently pending consideration. Part of land under Site 10 - identified for allocattion in the Berwick Eastern Arc Issues and Options report (May 2010). Brownfield site within Tweedmouth which offers a good opportunity for redevelopment. Application currently awaiting determination.. https://www.northumberland.gov.uk/NorthumberlandCountyCouncil/media/Planning-and-Building/planning%20policy/Studies%20and%20Evidence%20Reports/Housing%20Studies/1.%20SHLAA/Appendix-G-SHLAA-Sites-Summary-Assessment-Schedule.pdf 2018-12-31
56b902633c2f98677c169e2b832340006514eeea2376eb98aecc0c81a0ba816a notes Redundant waterworks facility within Tweedmouth now surplus to NWL requirements. Offers opportunity for redevelopment within the urban area. There is a covered reservoir and a pumping station in situ and a proposal will require clearance of some of this site infrastructure prior to redevelopment. Whilst not listed, the pumping station is of architectural significance and could be retained, perhaps through a conversion scheme. A hybrid application was permitted in 2019 for a total of 10 dwellings (18/01164/OUT). This included full consent for the conversion of the former pumping station to create 6 apartments and then outline permission for 4 further new-build homes in outline. A detailed application would be needed prior to commencement of the new-build aspect of the scheme. However, no progress was made and the application lapsed. A revised application will need to be approved to enable progress. Following this deliverability can be reappraised, but at present it is considered developable in the medium-term (6-10 years). 2024-12-11
84e96b3de4670fe1447e43871f8152b9c57f217ded0228c119491f98d4b5fd50 notes Redundant waterworks site within Tweedmouth, with existing infrastructure remaining in situ, but which offers opportunity for redevelopment. A hybrid application was permitted in May 2019 for 6 dwellings (in full) with a further 4 (in outline) to follow (18/01164/OUT). This proposal will involve demolition of a reservoir and the former pumping station prior to new-build development. Given the recent approval of this application, no start has been made on residential development to date. 2018-12-31
9f5854e74e18845bca3a3ad145a76a002a689278b835b9d735e398911716d82a notes Redundant waterworks facility within Tweedmouth with existing infrastructure remaining in situ. Now surplus to NWL requirements and offers opportunity for redevelopment within the urban area. A proposal would require demolition of a disused covered reservoir and the former pumping station prior to redevelopment. A hybrid application was permitted in May 2019 for a total of 10 dwellings (18/01164/OUT). This includes 6 apartments with full consent and a further 4 units in outline. A detailed application will follow for the rest of the scheme in due course. Development yet to commence but forecast for completion with the next 5 years. 2020-12-17