Skip to main content
9056
Provenance

Filters

Field

1 selected

Field

Clear

4 results

Fields: notes
Fact Field Value Latest Entry Date
2dc9717abddfc1d8a3b361a6dabec01c7f5d32c68368719d06109791147d399c notes Full application for development of 51 two- and three-bed semi and detached dwellings following site clearance permitted September 2017 - 17/00080/FUL. Permitted scheme for 51 units - yet to commence but forecast for delivery to start within next 5 years. Proposal involves comprehensive redevelopment of existing site, including demolition of existing buildings utilised for leisure uses.. https://www.northumberland.gov.uk/NorthumberlandCountyCouncil/media/Planning-and-Building/planning%20policy/Studies%20and%20Evidence%20Reports/Housing%20Studies/1.%20SHLAA/Appendix-G-SHLAA-Sites-Summary-Assessment-Schedule.pdf 2018-12-31
a5e11a57206c68458692487d2fe281e6605cf6a59feeff2fc87657dffe371df0 notes Project involves comprehensive redevelopment of a relatively large site following demolition of buildings last utilised for leisure uses. Planning permission is in place for a development of 51 dwellings (17/00080/FUL). The site has been cleared and the development is now under-construction and expected to be delivered by 2021/22. 2019-12-17
d71c9ed5ed2431c66bc1466ec6e017045e0252003684dd7d8336d31e62517080 notes Large site that is occupied by the former leisure centre and the Ashington Institute, both of which are now vacant. Offers a chance for regeneration of a significant area of land towards the town centre. Now available as part of a wider proposal to relocate the leisure centre to a new site within the town. A wide range of facilities had been provided for on-site prior to closure, with an outdoor bowling green also in situ alongside the main building. Demolition of the two redundant buildings and clearance of the remainder of the site required. A higher density scheme would be fitting given the surrounding residential development. An application for building of 51 dwellings has now been permitted (17/00080/FUL). The site has been cleared and the development is now under-construction. Completion forecast within the next 5 years. 2020-12-17
dd874f5272eacf28f3fba46270b78af82eb02a357e9e4986581b671e084d0a9a notes Large site that has been occupied by a leisure centre and the Ashington Institute, both of which are now vacant. Offers a chance for regeneration of a significant area of land towards the town centre. Now available as part of a wider proposal to relocate the leisure centre to a new site within the town. A wide range of facilities had been provided for on-site prior to closure, with an outdoor bowling green also in situ alongside the main building. Demolition of the two redundant buildings and clearance of the remainder of the site required. A higher density scheme would be fitting given the surrounding residential development. An application for building of 51 dwellings has now been permitted (17/00080/FUL). Site clearance was begun in 2018 and housebuilding commenced shortly afterwards. Development of 51 dwellings completed in 2020/21. 2021-12-17