2dc9717abddfc1d8a3b361a6dabec01c7f5d32c68368719d06109791147d399c | notes | Full application for development of 51 two- and three-bed semi and detached dwellings following site clearance permitted September 2017 - 17/00080/FUL. Permitted scheme for 51 units - yet to commence but forecast for delivery to start within next 5 years. Proposal involves comprehensive redevelopment of existing site, including demolition of existing buildings utilised for leisure uses.. https://www.northumberland.gov.uk/NorthumberlandCountyCouncil/media/Planning-and-Building/planning%20policy/Studies%20and%20Evidence%20Reports/Housing%20Studies/1.%20SHLAA/Appendix-G-SHLAA-Sites-Summary-Assessment-Schedule.pdf | 2018-12-31 | |
a5e11a57206c68458692487d2fe281e6605cf6a59feeff2fc87657dffe371df0 | notes | Project involves comprehensive redevelopment of a relatively large site following demolition of buildings last utilised for leisure uses. Planning permission is in place for a development of 51 dwellings (17/00080/FUL). The site has been cleared and the development is now under-construction and expected to be delivered by 2021/22. | 2019-12-17 | |
d71c9ed5ed2431c66bc1466ec6e017045e0252003684dd7d8336d31e62517080 | notes | Large site that is occupied by the former leisure centre and the Ashington Institute, both of which are now vacant. Offers a chance for regeneration of a significant area of land towards the town centre. Now available as part of a wider proposal to relocate the leisure centre to a new site within the town. A wide range of facilities had been provided for on-site prior to closure, with an outdoor bowling green also in situ alongside the main building. Demolition of the two redundant buildings and clearance of the remainder of the site required. A higher density scheme would be fitting given the surrounding residential development. An application for building of 51 dwellings has now been permitted (17/00080/FUL). The site has been cleared and the development is now under-construction. Completion forecast within the next 5 years. | 2020-12-17 | |
dd874f5272eacf28f3fba46270b78af82eb02a357e9e4986581b671e084d0a9a | notes | Large site that has been occupied by a leisure centre and the Ashington Institute, both of which are now vacant. Offers a chance for regeneration of a significant area of land towards the town centre. Now available as part of a wider proposal to relocate the leisure centre to a new site within the town. A wide range of facilities had been provided for on-site prior to closure, with an outdoor bowling green also in situ alongside the main building. Demolition of the two redundant buildings and clearance of the remainder of the site required. A higher density scheme would be fitting given the surrounding residential development. An application for building of 51 dwellings has now been permitted (17/00080/FUL). Site clearance was begun in 2018 and housebuilding commenced shortly afterwards. Development of 51 dwellings completed in 2020/21. | 2021-12-17 |