Skip to main content
9034
Provenance

Filters

Field

1 selected

Field

Clear

4 results

Fields: notes
Fact Field Value Latest Entry Date
4cb2b64a4df4616c7921bbe0f648e86188f4b1fe6b9ccaa4ebbceee4b29e5ff3 notes Former equestrian centre comprising of an indoor riding arena, associated buildings and infrastructure. Now only utilised for private use and considered surplus and available for redevelopment. An initial application was approved in 2016 to build 15 homes on clearance (15/02656/FUL). A revised proposals was then permitted in 2018 for demolition of the existing buildings and facilities and construction of a scheme of 26 homes (18/02250/FUL). A more recent permission has amended this scheme, increasing the yield to 27 dwellings (19/01637/FUL). Development now under-construction and forecast for completion in the next 5 years. 2020-12-17
7e284bc49b2824a1c69f29ce275742805adf0629f80d7d709e70c83556b94a98 notes Application approved for development of 15 homes following demolition of indoor riding arena and outbuildings - 15/02656/FUL. Permitted scheme for 15 units - yet to commence but forecast for delivery to start within next 5 years. Proposal for clearance of existing equestrian facility and buildings and replacement with new-build residential development.. https://www.northumberland.gov.uk/NorthumberlandCountyCouncil/media/Planning-and-Building/planning%20policy/Studies%20and%20Evidence%20Reports/Housing%20Studies/1.%20SHLAA/Appendix-G-SHLAA-Sites-Summary-Assessment-Schedule.pdf 2018-12-31
92b412e65ddd879220736d762b6defe9526bab79ca9c86faa0b6b8aa4be1eb2f notes Development under-construction for clearance of the existing equestrian infrastructure and buildings and replacement with a new-build residential development of 26 units (18/02250/FUL). The is expected to be completed by 2020/21. The current scheme is a revised proposal that supersedes a previous consent for 15 homes (15/02656/FUL). 2019-12-17
dfd84e4a54367fd9ab46efcc2e1307bb0c99f5bc1f531a3fcb515f07767689bc notes Former equestrian centre comprising of an indoor riding arena, associated buildings and infrastructure. Now only utilised for private use and considered surplus and available for redevelopment. An initial application was approved in 2016 to build 15 homes on clearance (15/02656/FUL). A revised proposals was then permitted in 2018 for demolition of the existing buildings and facilities and construction of a scheme of 26 homes (18/02250/FUL). Works commenced in 2018 before a partial amendment was made to the scheme during the construction process, increasing the overall yield to 27 dwellings (19/01637/FUL). Development completed in 2020/21. 2021-12-17