5176
Provenance

Filters

Field

1 selected

Field

Clear

4 results

Fields: notes
Fact Field Value Latest Entry Date
66f1a960b01bdac8536d45d356dc3029c888ad5dd0b2a56a3ede29d47ecaef3c notes Industrial workshop and land that were originally utilised for the storage and maintenance of heavy goods vehicles and plant. More recently, the premises have been occupied by a commercial garage, for car servicing and repair. Chance for small-scale infill scheme within the existing urban environment, following demolition and any necessary remediation. Higher density of development indicated recognises the location and the nature of likely flat/apartment development. Consent previously granted for construction of 6 flats in 2008 but this lapsed (08/00326/FUL). The use of the site as a garage was enabled by subsequent permission dating from 2012 (11/01433/FUL). This also permitted temporary siting of a residential caravan. A more recent proposal to extend the garage facilities was refused in 2016 (15/03760/FUL). The current availability of the site is uncertain, as there has been no update from the landowner in recent times, and no further proposals for (re)development. Any development is likely to be in the longer-term (11-15 years). 2020-12-17
81ce85efaffaca1527f1a81994956180a94b8ab60605bd6f98fb3dc4930725ed notes Consent previously granted for construction of 6 flats but this has now lapsed - 08/00326/FUL. Previous application refused - 08/00259/FUL. Opportunity for potential redevelopment of land within existing urban environment through infill scheme - previous permission lapsed prior to being implemented. Higher density of development indicated recognises infill and nature of likely development. https://www.northumberland.gov.uk/NorthumberlandCountyCouncil/media/Planning-and-Building/planning%20policy/Studies%20and%20Evidence%20Reports/Housing%20Studies/1.%20SHLAA/Appendix-G-SHLAA-Sites-Summary-Assessment-Schedule.pdf 2017-12-17
c5085de20781029ab926ae86688253c7bdbdf25a8bcff790786bfc871e64e0c2 notes Industrial workshop and land that were originally utilised for the storage and maintenance of heavy goods vehicles and plant. More recently, the premises have been occupied by a commercial garage, for car servicing and repair. Chance for small-scale infill scheme within the existing urban environment following demolition and any necessary remediation. Higher density of development indicated recognises the location and the nature of likely flat/apartment development. Consent previously granted for construction of 6 flats but this lapsed (08/00326/FUL). The use of the site as a garage was enabled by subsequent permission (11/01433/FUL). This also permitted temporary siting of a residential caravan. A more recent proposal to extend the garage facilities was refused (15/03760/FUL). The current availability of the site is uncertain. There still may be potential in the long-term but no residential development is forecast within the plan period at present. 2020-12-17
ec95788ca9a0a6ee517dca090dc6d831b3b6f92c79751f0ebbb52bf8b109ba07 notes Opportunity for redevelopment of garage and workshop buildings following clearance. Chance for small-scale infill scheme within the existing urban environment. .Consent previously granted for construction of 6 flats but this has now lapsed (08/00326/FUL). Higher density of development indicated recognises the location and the nature of likely flat/apartment development. Previous application refused (08/00259/FUL). 2019-12-17