Skip to main content
5035
Provenance

Filters

Field

1 selected

Field

Clear

3 results

Fields: notes
Fact Field Value Latest Entry Date
23177094580a2f511158f467a46b4ab2054c4e9773b4d4b3670e183a27abcf1c notes Former commercial garage premises that has latterly been vacant. Now offers chance for infill, although the existing buildings would require demolition prior to redevelopment. The main building was originally a chapel, which had latterly been converted to a garage for vehicle maintenance and servicing. Relatively high yield representative of location and previous proposals for an apartment scheme that would be in keeping with setting. An earlier application for clearance and construction of 10 apartments was approved but lapsed (07/00250/FUL). A subsequent application to extend time limit was submitted but then withdrawn (10/S/00570/VARYCO). Therefore the original permission lapsed. The current availability of the site is uncertain. There still may be potential in the long-term but no residential development is forecast within the plan period at present. 2020-12-17
2f8dcc90b4522154086c9653aedc8bea3388cd5fd3a8431d0517b8db8dd47ca4 notes Permission lapsed without implementation for scheme of 10 apartments - 07/00250/FUL. A subsequent application to extend time limit was withdrawn - 10/S/00570/VARYCO. Existing buildings and land, including garage, with potential chance for urban infill redevelopment - previous permission lapsed without being implemented. Relatively high yield representative of location and previous proposals for apartment scheme that would be in keeping with setting. https://www.northumberland.gov.uk/NorthumberlandCountyCouncil/media/Planning-and-Building/planning%20policy/Studies%20and%20Evidence%20Reports/Housing%20Studies/1.%20SHLAA/Appendix-G-SHLAA-Sites-Summary-Assessment-Schedule.pdf 2017-12-17
308b6573d1a5afbaa8ec02f2a23df403644bb82c8c21df66351d4f36fae7dccc notes Buildings and land within urban area, including garage, with potential chance for urban infill redevelopment. Permission lapsed without implementation for a scheme of 10 apartments (07/00250/FUL). Relatively high yield representative of location and previous proposals for an apartment scheme that would be in keeping with setting. Following the above, a subsequent application to extend time limit was withdrawn (10/S/00570/VARYCO). 2019-12-17