1030
Provenance
5 results
Fields:
notes
| Fact | Field | Value | Latest Entry Date | |
|---|---|---|---|---|
| 84a114149db2d2dc820fa34507445a2c3bf990a70c51877aa1300a0da6f02c0e | notes | Previous outline permission for 14 dwellings has lapsed - 99/B/0268. A number of other applications also relate to site. The above application extended the time limit of previous outline consents - N/96/B/0206/P, N/92/B/0651/P. Potential redevelopment within urban area, opportunity for redevelopment of industrial buildings and land - previous consent lapsed before implementation. Yield appropriate for redevelopment on existing footprint of built development. https://www.northumberland.gov.uk/NorthumberlandCountyCouncil/media/Planning-and-Building/planning%20policy/Studies%20and%20Evidence%20Reports/Housing%20Studies/1.%20SHLAA/Appendix-G-SHLAA-Sites-Summary-Assessment-Schedule.pdf | 2017-12-17 | |
| a9fbe1ad368871e39eccef258afe4bc65760c4983f2abd7eb34e51894fa9610d | notes | Printworks complex comprising of industrial buildings and associated land. Currently occupied by an operational business and relocation would be required.. Site has been identified as having potential for redevelopment in the past. To be suitable, a scheme should be limited to the existing footprint of built development, but a slightly higher yield may be apt for the urban location. Demolition of the buildings and outbuildings would be required prior to this. with clearance required prior to progressing. Outline permission for clearance and construction of 14 dwellings originally granted in 1992 but has lapsed, despite being renewed on two further occasions (N/92/B/0651/P, N/96/B/0206/P, N/99/B/0268). Recently confirmed that the landowner is still keen to redevelop the site, although it is not yet being marketed. Currently considered developable later in the plan period. | 2020-12-17 | |
| bc3cd3c936a75022804522a8922a0363979037c18f1ad24f804c600bfead26bb | notes | Potential redevelopment within urban area, opportunity for redevelopment of industrial buildings and land. Previous outline permission for 14 dwellings has lapsed (99/B/0268). A number of other applications also relate to site. The above application extended the time limit of previous outline consents (N/96/B/0206/P, N/92/B/0651/P). Yield appropriate for redevelopment on existing footprint of built development. | 2019-12-17 | |
| bec88426a3aab9037961d16bf9fe7a6ee6dfa6a3ea6d7602f58b3f90278ee8b9 | notes | Printworks complex comprising of industrial buildings and associated land. Currently occupied by an operational business and relocation would be required in order for the site to become available. However, the land has been identified as having potential for redevelopment in the past, and there is a lengthy planning history evident. To be suitable, a scheme should be limited to the existing footprint of built development, but a slightly higher yield may be apt for the urban location. Demolition of the buildings and outbuildings would be required prior to progression. Outline permission for clearance and construction of 14 dwellings originally granted in 1992 but, despite being renewed on two further occasions, lapsed without any progress being made progress (N/92/B/0651/P, N/96/B/0206/P, N/99/B/0268). Recently confirmed (EiP 2020) that the landowner is still keen to redevelop the site, although it is not yet being marketed. Currently considered developable in the medium-term (6-10 years). | 2024-11-19 | |
| cde3b5b88f0b12591294ea156000844398edb3a708da6ffddc6c378ebbab145c | notes | Printworks complex comprising of industrial buildings and associated land. Currently occupied by an operational business and relocation would be required in order for the site to become available. However, the land has been identified as having potential for redevelopment in the past, and there is a lengthy planning history evident. To be suitable, a scheme should be limited to the existing footprint of built development, but a slightly higher yield may be apt for the urban location. Demolition of the buildings and outbuildings would be required prior to progression. Outline permission for clearance and construction of 14 dwellings originally granted in 1992 but, despite being renewed on two further occasions, this lapsed without any progress being made progress (N/92/B/0651/P, N/96/B/0206/P, N/99/B/0268). Confirmed that the landowner is still keen to redevelop the site, although it is not yet being marketed. Currently considered developable in the medium-term (6 to 10 years). | 2024-11-19 |