Skip to main content
BR/2017/32
Provenance

Filters

Field

1 selected

Field

Clear

4 results

Fields: notes
Fact Field Value Latest Entry Date
0367756050a3f3cd64fb8506215cb5548c4ce2fa231980de7182c6fd961620b4 notes Site under construction. Residential development of up to 29 dwellings, with associated access, landscaping and public open space. 2024-12-13
19cbe46258bfa6f64d9f8eccc3c42f110b452650e2686a10116c5298039d9c15 notes The site is included as an allocation within the adopted Housing Site Allocations Development Plan Document (HSA DPD). Whilst the site is used mainly for open storage of caravans, there are two workshops which are permanent structures. The classification of the land as previously developed or greenfield will depend on the extent the curtilage of the permanent structures. It is unclear whether the land used for storage of caravans is within the curtilage of the workshops, and for that reason the site was classified and assessed as a mix of previously developed and greenfield in the Sustainability Appraisal of the HSA DPD. http://info.westberks.gov.uk/CHttpHandler.ashx?id=43955&p=0 2017-10-17
9cb689b711c6880e9a38c163b9958ad8e739e502d3cc4d1aa0b7bb0c1c1ff1e2 notes The site is included as an allocation within the adopted Housing Site Allocations Development Plan Document. http://info.westberks.gov.uk/CHttpHandler.ashx?id=43955&p=0 2019-01-08
ee08305a7260dad08a5fa09f79ede99448338ce1ed260e4269641f1c74024afa notes Allocation in adopted Housing Site Allocations Development Plan Document. Expected to start delivering in 2023. Residential development of up to 29 dwellings, with associated access, landscaping and public open space. 2022-12-12