Fact
cb893fbea8317a197938abad289199869d831dea00c77bfb05e24c3b3d0d7bc7
cb893fbea8317a197938abad289199869d831dea00c77bfb05e24c3b3d0d7bc7
|
notes
|
The minimum and maximum number of dwellings that the land is capable of supporting are estimates. The estimates are derived from the residential capacity estimates in the London Strategic Housing Land Availability Assessment 2017. The number of dwellings that the land can support can only be determined through the planning permission process.
|
WBR/17/0154
|
2019-03-31
|
2019-03-31
|
c30f8b4e49dc99286e95a53d4604767cdb2c6fd445f5adc12b845c67d02e10cf
|
Resources
c30f8b4e49dc99286e95a53d4604767cdb2c6fd445f5adc12b845c67d02e10cf
|
c5ce1222c0174faa58299756be940e0055a53de9faf9a5aa8a7711855a7ddbe2
|
c906cff32aaa59dc601f5ec819e3299dd44621b69cb6f402413eb9ed4b272eab
|