Fact
b8f6ae53c49befc5c62d26b3b09a58772990d4c4058b9c2d575ff7073c394b78
b8f6ae53c49befc5c62d26b3b09a58772990d4c4058b9c2d575ff7073c394b78
|
notes
|
The minimum and maximum number of dwellings that the land is capable of supporting are estimates. The estimates are derived from the residential capacity estimates in the London Strategic Housing Land Availability Assessment 2017. The number of dwellings that the land can support can only be determined through the planning permission process.
|
WBR/17/0166
|
2020-01-14
|
2020-01-14
|
c30f8b4e49dc99286e95a53d4604767cdb2c6fd445f5adc12b845c67d02e10cf
|
Resources
c30f8b4e49dc99286e95a53d4604767cdb2c6fd445f5adc12b845c67d02e10cf
|
c906cff32aaa59dc601f5ec819e3299dd44621b69cb6f402413eb9ed4b272eab
|