Fact
afbdcee4ee5d9f51b0a28244df8beab3fb8e5c6d4f1f5bf206b6b0886d498746
afbdcee4ee5d9f51b0a28244df8beab3fb8e5c6d4f1f5bf206b6b0886d498746
|
notes
|
The minimum and maximum number of dwellings that the land is capable of supporting are estimates. The estimates are derived from the residential capacity estimates in the London Strategic Housing Land Availability Assessment 2017. The number of dwellings that the land can support can only be determined through the planning permission process.
|
WBR/20/0029
|
2020-03-31
|
2020-03-31
|
c30f8b4e49dc99286e95a53d4604767cdb2c6fd445f5adc12b845c67d02e10cf
|
Resources
c30f8b4e49dc99286e95a53d4604767cdb2c6fd445f5adc12b845c67d02e10cf
|