Fact a8bdeb11d29bdff00066d23b7ec8ea341bf8fefddb231410fdaebfb955745f05
Field description
Value In the instance of the 450mm public combined sewer, no building or other obstruction including landscape features shall be located over or within 3.5 metres either side of the centre line of the public sewer i.e. a protected strip width of 7 metres, that crosses the site. Furthermore, no construction works in the relevant area(s) of the site shall commence until measures to protect the public sewerage infrastructure that is laid within the site boundary have been implemented in full accordance with details that have been submitted to and approved by the Local Planning Authority. The details shall include but not be exclusive to the means of ensuring that access to the pipe for the purposes of repair and maintenance by the statutory undertaker shall be retained at all times. If the required stand-off or protection measures are to be achieved via diversion or closure of the sewer, the developer shall submit evidence to the Local Planning Authority that the diversion or closure has been agreed with the relevant statutory undertaker and that, prior to construction in the affected area, the approved works have been undertaken.
Entity Y Water
Earliest entry date 2025-02-25
Latest entry date 2025-02-25
Latest resource 6e210b1fa5551f87528b09d173fdd0a966e74dcacd9d417ebb30e847ddc5dc1c
Resources
Entry Date Resource
2025-02-25 6e210b1fa5551f87528b09d173fdd0a966e74dcacd9d417ebb30e847ddc5dc1c