Fact
a5f5b36551c33c5c59fe97bb4d63d808d8bb66e7c5ae298d71242ec87db40a2e
a5f5b36551c33c5c59fe97bb4d63d808d8bb66e7c5ae298d71242ec87db40a2e
|
notes
|
The minimum and maximum number of dwellings that the land is capable of supporting are estimates. The estimates are derived from the residential capacity estimates in the London Strategic Housing Land Availability Assessment 2017. The number of dwellings that the land can support can only be determined through the planning permission process.
|
WBR/17/0158
|
2019-03-31
|
2019-03-31
|
c30f8b4e49dc99286e95a53d4604767cdb2c6fd445f5adc12b845c67d02e10cf
|
Resources
c30f8b4e49dc99286e95a53d4604767cdb2c6fd445f5adc12b845c67d02e10cf
|
c5ce1222c0174faa58299756be940e0055a53de9faf9a5aa8a7711855a7ddbe2
|
c906cff32aaa59dc601f5ec819e3299dd44621b69cb6f402413eb9ed4b272eab
|