Fact
a573352c3568611ed512139d7cc91b3049c0ebf1c48d1abd5fa354812f507537
a573352c3568611ed512139d7cc91b3049c0ebf1c48d1abd5fa354812f507537
|
description
|
In the instance of the 300mm public combined sewer, no building or other obstruction including landscape features shall be located over or within 3 metres either side of the centre line of the public sewer i.e. a protected strip width of 6 metres, that crosses the site. Furthermore, no construction works in the relevant area(s) of the site shall commence until measures to protect the public sewerage infrastructure that is laid within the site boundary have been implemented in full accordance with details that have been submitted to and approved by the Local Planning Authority. The details shall include but not be exclusive to the means of ensuring that access to the pipe for the purposes of repair and maintenance by the statutory undertaker shall be retained at all times. If the required stand-off or protection measures are to be achieved via diversion or closure of the sewer, the developer shall submit evidence to the Local Planning Authority that the diversion or closure has been agreed with the relevant statutory undertaker and that, prior to construction in the affected area, the approved works have been undertaken.
|
Y Water
|
2025-02-25
|
2025-02-25
|
6e210b1fa5551f87528b09d173fdd0a966e74dcacd9d417ebb30e847ddc5dc1c
|
Resources
6e210b1fa5551f87528b09d173fdd0a966e74dcacd9d417ebb30e847ddc5dc1c
|