Skip to main content
Obscure Glazing
Provenance

Filters

Field

1 selected

Field

Clear

1 result

Fact Field Value Latest Entry Date
d3fea0b6821b84b72d1b92758ce33ea74fbcb866504a5f70c5df178805af76b0 description Before the first occupation of the building/extension hereby permitted, the windows as indicated on the approved plans serving the ground floor W/C and utility, and first floor en-suite shall be permanently obscure to a level of obscurity to Pilkington level 3 or above or its technical equivalent by other manufactures and shall be permanently retained in that condition thereafter, unless otherwise approved in writing by the local planning authority. 2025-02-25