Skip to main content
BFR C24
Provenance

Filters

Field

1 selected

Field

Clear

3 results

Fields: notes
Fact Field Value Latest Entry Date
c7c5a797adf10a94243fe9cbe9c8c66b508645fe1137208116b7bbd0ef8a6588 notes Site under construction as at 31/03/2022. Block A flatted scheme completed in 2022/23 FY providing 50 flats/dwellings, Block B/C is nearing completion at December 2023 that will provide 100 flats /dwellings. 2024-04-01
e6b5d7c4b73b16690922e839474b440ef6610cfe9cc9555755a370b99d9fdb52 notes Site previously assessed through SHLAA as site 2030. The site has been subject to a bid to the HCA for Starter Homes funding and it was assumed that 40 dwellings could be delivered on the site. However, as part of an urban design review, consideration was also made of a mix of uses being deployed on site which reduces the developable area for housing (assuming 50dph) an alternative yield of 29 dwellings has been assumed.. Awaiting S106 2018-12-17
f581965f3356fb2271b5eef1e48edfd48571787f1bef45e8a8c57b52ccb770f8 notes Site previously assessed through SHLAA as site 2030. The site has been subject to a bid to the HCA for Starter Homes funding and it was assumed that 40 dwellings could be delivered on the site. However, as part of an urban design review, consideration was also made of a mix of uses being deployed on site which reduces the developable area for housing (assuming 50dph) an alternative yield of 29 dwellings has been assumed. 2016-12-31