3133
Provenance
3 results
Fields:
notes
Fact | Field | Value | Latest Entry Date | |
---|---|---|---|---|
29fcd3f3d5702dd6f9332e503941e4a6e54a9234fc564ed9d3bd325cb1cda269 | notes | Potential redevelopment of former garage site and vacant land within the settlement. Indicative yield identified could be towards the lower range of what is appropriate given the location. A previous proposal for a part change of use from a garage to provide 10 dwellings was withdrawn (15/04227/FUL). Longer-term potential is still considered to exist. | 2019-12-17 | |
5976dde37b539a98a8bebb5669021dd9f16082b14cd7e60952233389546153a9 | notes | Commercial garage site and associated land, comprising a workshop and outbuildings. The site was vacant for a time but is now occupied by a tyre business. There is also an associated two-storey dwelling on the site. During the period the site was unused, it was identified for redevelopment. Works would require demolition of the existing garage and remediation. Identified yield could be towards the lower range of what is appropriate given the location. A previous proposal for demolition of the garage premises and construction of 10 dwellings was submitted but later withdrawn (15/04227/FUL). An existing business remains operating from the site and there has been no recent indication of relocation and/or change in circumstances. There still may be potential in the long-term but no residential development is forecast within the plan period at present. | 2020-12-17 | |
f560f848cd6940fe4717b160b506c817f07ca6f4dd50af67ee2abb209469af02 | notes | Proposal for a part change of use from garage to residential use, providing 10 dwellings, withdrawn in June 2017 - 15/04227/FUL. Potential redevelopment of former garage site and vacant land within village. Indicative yield identified could be at lower range given the setting. https://www.northumberland.gov.uk/NorthumberlandCountyCouncil/media/Planning-and-Building/planning%20policy/Studies%20and%20Evidence%20Reports/Housing%20Studies/1.%20SHLAA/Appendix-G-SHLAA-Sites-Summary-Assessment-Schedule.pdf | 2017-12-17 |