B/BLR/0067
Provenance
3 results
Fields:
notes
Fact | Field | Value | Latest Entry Date | |
---|---|---|---|---|
5ab84e4b96effc19ef755525889285ea72bd4eb6b1528efacf3d538e8d37c5f9 | notes | Erection of a 4 to 7 storey tertiary teaching building and surface level car park (first phase), the removal of TPO�d trees and the erection of a 9 to 14 storey residential student accommodation building providing 550 student beds arranged as a mixtu | 2017-12-21 | |
5c03c2ef0c1fc74f88af4a58e43d6e3e4c409ce3908bccff4ef75389d8ffc12a | notes | Erection of a 4 to 7 storey tertiary teaching building and surface level car park (first phase), the removal of TPO�d trees and the erection of a 9 to 14 storey residential student accommodation building providing 550 student beds arranged as | 2017-12-20 | |
b0b9dd68ad244d1c23a1aff299ecea8ffc978c14e7eac610849994e01f611048 | notes | Erection of a 4 to 7 storey tertiary teaching building and surface level car park (first phase), the removal of TPO'd trees and the erection of a 9 to 14 storey residential student accommodation building providing 550 student beds arranged... | 2019-12-20 |