Fact
9a683fbdab931c695a068967fdc0739b3de20d8757a6c4cf8c0fc3c6d1ee98d8
9a683fbdab931c695a068967fdc0739b3de20d8757a6c4cf8c0fc3c6d1ee98d8
|
notes
|
The minimum and maximum number of dwellings that the land is capable of supporting are estimates. The estimates are derived from the residential capacity estimates in the London Strategic Housing Land Availability Assessment 2017. The number of dwellings that the land can support can only be determined through the planning permission process.
|
WBR/17/0163
|
2019-03-31
|
2019-03-31
|
c30f8b4e49dc99286e95a53d4604767cdb2c6fd445f5adc12b845c67d02e10cf
|
Resources
c30f8b4e49dc99286e95a53d4604767cdb2c6fd445f5adc12b845c67d02e10cf
|
c5ce1222c0174faa58299756be940e0055a53de9faf9a5aa8a7711855a7ddbe2
|
c906cff32aaa59dc601f5ec819e3299dd44621b69cb6f402413eb9ed4b272eab
|