Fact
7b5e39297b10e3440b04a0fe6f1e52d60745dfe7f5d6e5c852c8d84a3f7b0c46
7b5e39297b10e3440b04a0fe6f1e52d60745dfe7f5d6e5c852c8d84a3f7b0c46
|
description
|
The development shall be carried out in accordance with the submitted flood risk assessment (ref AEG02570_DN5_Bentley_07 / aegaea / 30/06/2023) and the following mitigation measures it details: o Finished floor levels shall be set no lower than 5.83 metres above Ordnance Datum (AOD) These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development.
|
FRA
|
2025-02-25
|
2025-02-25
|
6e210b1fa5551f87528b09d173fdd0a966e74dcacd9d417ebb30e847ddc5dc1c
|
Resources
6e210b1fa5551f87528b09d173fdd0a966e74dcacd9d417ebb30e847ddc5dc1c
|