Fact 67bc4fd69fd00ffea9e5c09dc4c92135d7af6d00700a385e5f8aad859978e53d
Field description
Value The development shall be carried out in accordance with the submitted Addendum to the FRA (prepared by Waldeck Consulting, reference 220041-WDK-00-SI-RP-C-33301, Version P02, dated 1 June 2023) and the following mitigation measures it details: - Finished floor levels shall be set no lower than 3.6 metres above Ordnance Datum (AOD) The mitigation measure shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measure detailed above shall be retained and maintained thereafter throughout the lifetime of the development.
Entity EA FRA
Earliest entry date 2025-02-25
Latest entry date 2025-02-25