description
|
The development hereby granted shall not be begun until details of the foul, surface water and land drainage systems and all related works necessary to drain the site have been submitted to and approved by the Local Planning Authority. The site shall be developed with separate systems of drainage for foul and surface water on and off site. These works shall be carried out concurrently with the development and the drainage system shall be operating prior to the occupation of the development.
|
Drainage DA01
|
2025-02-25
|
2025-02-25
|