Fact
3c6ae5b464a55dbd62b27d4a021c2b9c519d5ef3852d9851a4f221d961ca810a
3c6ae5b464a55dbd62b27d4a021c2b9c519d5ef3852d9851a4f221d961ca810a
|
notes
|
The minimum and maximum number of dwellings that the land is capable of supporting are estimates. The estimates are derived from the residential capacity estimates in the London Strategic Housing Land Availability Assessment 2017. The number of dwellings that the land can support can only be determined through the planning permission process.
|
WBR/17/0144
|
2019-03-31
|
2019-03-31
|
c30f8b4e49dc99286e95a53d4604767cdb2c6fd445f5adc12b845c67d02e10cf
|
Resources
c30f8b4e49dc99286e95a53d4604767cdb2c6fd445f5adc12b845c67d02e10cf
|
c5ce1222c0174faa58299756be940e0055a53de9faf9a5aa8a7711855a7ddbe2
|
c906cff32aaa59dc601f5ec819e3299dd44621b69cb6f402413eb9ed4b272eab
|