Fact
1406a08b6f074a35fae52bf76156960c7437d5e81cdc1a0b911f9e377827c04d
1406a08b6f074a35fae52bf76156960c7437d5e81cdc1a0b911f9e377827c04d
|
notes
|
Potential capacity based on a density multiplier with the minimum based on 30dph and maximum at 40dph. Physical constraints identified include woodland and potentially contaminated land. Allocated for Hsg in adopted local plan (March 2022).
|
H1032
|
2023-01-09
|
2023-01-09
|
2f53e1ceb565846fe1b2c2188ba7acb2a9f93a8415bf81731b46c1ae33e0a44b
|
Resources
2f53e1ceb565846fe1b2c2188ba7acb2a9f93a8415bf81731b46c1ae33e0a44b
|