notes
|
Approved 14/11/2014 | March 2018: 116 dwellings completed. 33 dwellings under construction, 52 dwellings where no construction had started | Allocated as Policy H/2 in the South Cambridgeshire Adopted Local Plan (September 2018). Phase 1 (201 dwellings)
|