Fact
0515521f43b25044badc8b932910f645642aeda08ab7e94a2d28147243146715
0515521f43b25044badc8b932910f645642aeda08ab7e94a2d28147243146715
|
notes
|
The minimum and maximum number of dwellings that the land is capable of supporting are estimates. The estimates are derived from the residential capacity estimates in the London Strategic Housing Land Availability Assessment 2017. The number of dwellings that the land can support can only be determined through the planning permission process.
|
WBR/17/0141
|
2019-03-31
|
2019-03-31
|
c30f8b4e49dc99286e95a53d4604767cdb2c6fd445f5adc12b845c67d02e10cf
|
Resources
c30f8b4e49dc99286e95a53d4604767cdb2c6fd445f5adc12b845c67d02e10cf
|
c5ce1222c0174faa58299756be940e0055a53de9faf9a5aa8a7711855a7ddbe2
|
c906cff32aaa59dc601f5ec819e3299dd44621b69cb6f402413eb9ed4b272eab
|