Design code rule
R2.9
Field | Value | Fact links |
---|---|---|
Reference | R2.9 | Facts |
Prefix | design-code-rule | Facts |
Name | Facts | |
Dataset | Design code rule | no fact link |
Organisation | Essex County Council | no fact link |
Start date | no fact link | |
End date | no fact link | |
Entry date | 2024-06-11 | Facts |
Typology | policy | no fact link |
Description | All proposals must outline the carbon footprint of their proposed construction strategy and as part of the whole life carbon assessment undertaken. This should include steps taken to minimise impact. | Facts |
Design code | uttlesford-design-code | Facts |
Document url | https://www.essexdesignguide.co.uk/uttlesford-design-code/district-wide-coding/nature/ | Facts |
Documentation url | https://www.essexdesignguide.co.uk/uttlesford-design-code/district-wide-coding/nature/ | Facts |
Contents
{
"reference": "R2.9",
"prefix": "design-code-rule",
"name": "",
"dataset": "design-code-rule",
"organisation-entity": "133",
"start-date": "",
"end-date": "",
"entry-date": "2024-06-11",
"typology": "policy",
"geometry": "",
"point": "",
"entity": 8700972,
"description": "All proposals must outline the carbon footprint of their proposed construction strategy and as part of the whole life carbon assessment undertaken. This should include steps taken to minimise impact.",
"design-code": "uttlesford-design-code",
"document-url": "https://www.essexdesignguide.co.uk/uttlesford-design-code/district-wide-coding/nature/",
"documentation-url": "https://www.essexdesignguide.co.uk/uttlesford-design-code/district-wide-coding/nature/"
}
© Crown copyright and database right 2025
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.