Planning condition
Interceptor
About this entity
| Fact links | ||
|---|---|---|
| CURIE | planning-condition:U0130780 | no fact link |
| Prefix | planning-condition | Facts about Prefix |
| Reference | U0130780 | Facts about Reference |
| Name | Interceptor | Facts about Name |
| Quality | Authoritative: We have some data from the authoritative source | no fact link |
| Dataset | Planning condition | no fact link |
| Organisation | Doncaster Metropolitan Borough Council | no fact link |
| Start date | Facts about Start date | |
| End date | Facts about End date | |
| Entry date | 2025-06-21 | Facts about Entry date |
| Typology | policy | no fact link |
| Notes | Unique Condition | Facts about Notes |
| Reason | To avoid pollution of the public sewer and land drainage system in accordance with Policies 55 and 56 of the Local Plan. | Facts about Reason |
| Description | All surface water run-off from the site, except roof water, shall be discharged to the public surface water sewer/land drainage system or Highway Drain via a suitable oil/petrol/grit interceptor. Details of these arrangements shall be approved by the Local Planning Authority prior to the commencement of the development, and they shall be fully operational before the site is brought into use. | Facts about Description |
Contents
{
"entry-date": "2025-06-21",
"start-date": "",
"end-date": "",
"entity": 73003261,
"name": "Interceptor",
"dataset": "planning-condition",
"typology": "policy",
"reference": "U0130780",
"prefix": "planning-condition",
"organisation-entity": 109,
"geometry": "",
"point": "",
"quality": "authoritative",
"notes": "Unique Condition",
"reason": "To avoid pollution of the public sewer and land drainage system in accordance with Policies 55 and 56 of the Local Plan.",
"description": "All surface water run-off from the site, except roof water, shall be discharged to the public surface water sewer/land drainage system or Highway Drain via a suitable oil/petrol/grit interceptor. Details of these arrangements shall be approved by the Local Planning Authority prior to the commencement of the development, and they shall be fully operational before the site is brought into use."
}
© Crown copyright and database right 2026
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.