Planning condition

Drainage - Pre commencement

About this entity

Fact links
CURIE planning-condition:U0130771 no fact link
Prefix planning-condition Facts about Prefix
Reference U0130771 Facts about Reference
Name Drainage - Pre commencement Facts about Name
Quality Authoritative: We have some data from the authoritative source no fact link
Dataset Planning condition no fact link
Organisation Doncaster Metropolitan Borough Council no fact link
Start date Facts about Start date
End date Facts about End date
Entry date 2025-06-21 Facts about Entry date
Typology policy no fact link
Notes Unique Condition Facts about Notes
Reason To secure suitable foul and surface water drainage systems for the development in accordance with Policy 56 of the Local Plan. The details are required to be discharged prior to the commencement of development to ensure that the site layout is agreed before works commence. Facts about Reason
Description No development shall take place until a drainage strategy for the site has been submitted to and approved by the Local Planning Authority. The system shall be designed such that no additional or increased rate of flow of surface water will drain to any water body or adjacent land and that there is capacity in the installed drainage system to contain below ground level the run-off from a 1 in 100 year rainfall event plus 40% on stored volumes as an allowance for climate change as set out in National Planning Practice Guidance. The drainage strategy shall include details of the drainage management and maintenance plan for the site. The drainage system for foul and surface water drainage shall be installed, retained, managed and maintained for the lifetime of the development in accordance with the approved details and the management and maintenance plan. Facts about Description

Contents

{
        "entry-date": "2025-06-21",
        "start-date": "",
        "end-date": "",
        "entity": 73003252,
        "name": "Drainage - Pre commencement",
        "dataset": "planning-condition",
        "typology": "policy",
        "reference": "U0130771",
        "prefix": "planning-condition",
        "organisation-entity": 109,
        "geometry": "",
        "point": "",
        "quality": "authoritative",
        "notes": "Unique Condition",
        "reason": "To secure suitable foul and surface water drainage systems for the development in accordance with Policy 56 of the Local Plan. The details are required to be discharged prior to the commencement of development to ensure that the site layout is agreed before works commence.",
        "description": "No development shall take place until a drainage strategy for the site has been submitted to and approved by the Local Planning Authority. The system shall be designed such that no additional or increased rate of flow of surface water will drain to any water body or adjacent land and that there is capacity in the installed drainage system to contain below ground level the run-off from a 1 in 100 year rainfall event plus 40% on stored volumes as an allowance for climate change as set out in National Planning Practice Guidance. The drainage strategy shall include details of the drainage management and maintenance plan for the site. The drainage system for foul and surface water drainage shall be installed, retained, managed and maintained for the lifetime of the development in accordance with the approved details and the management and maintenance plan."
    }

© Crown copyright and database right 2026

Licensed under the Open Government Licence v.3.0.


Help improve this data

Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.