Planning condition
Design - Equipment finishes
About this entity
| Fact links | ||
|---|---|---|
| CURIE | planning-condition:U0127522 | no fact link |
| Prefix | planning-condition | Facts |
| Reference | U0127522 | Facts |
| Name | Design - Equipment finishes | Facts |
| Quality | Authoritative: We have some data from the authoritative source | no fact link |
| Dataset | Planning condition | no fact link |
| Organisation | Doncaster Metropolitan Borough Council | no fact link |
| Start date | Facts | |
| End date | Facts | |
| Entry date | 2025-06-21 | Facts |
| Typology | policy | no fact link |
| Notes | Unique Condition | Facts |
| Reason | In the interest of the visual amenity of the area and so that the Local Planning Authority shall be satisfied as to the details. | Facts |
| Description | Prior to the construction or installation of the respective structures identified below, the following details shall first be submitted to, and agreed in writing by, the Local planning Authority: Details of the colour and finish of the GIS hall building. Details of the colour and finish of the energy storage containers. Details of the colour and finish of the water containers. Details of the colour and finish of the DNO substation building. Details of the colour and finish of the perimeter fence. Details including design, height, colour and finish of site access gate. The development shall then be constructed in accordance with the approved details and shall be retained and maintained as such at all times. | Facts |
Contents
{
"entry-date": "2025-06-21",
"start-date": "",
"end-date": "",
"entity": 73003153,
"name": "Design - Equipment finishes",
"dataset": "planning-condition",
"typology": "policy",
"reference": "U0127522",
"prefix": "planning-condition",
"organisation-entity": 109,
"geometry": "",
"point": "",
"quality": "authoritative",
"notes": "Unique Condition",
"reason": "In the interest of the visual amenity of the area and so that the Local Planning Authority shall be satisfied as to the details.",
"description": "Prior to the construction or installation of the respective structures identified below, the following details shall first be submitted to, and agreed in writing by, the Local planning Authority: Details of the colour and finish of the GIS hall building. Details of the colour and finish of the energy storage containers. Details of the colour and finish of the water containers. Details of the colour and finish of the DNO substation building. Details of the colour and finish of the perimeter fence. Details including design, height, colour and finish of site access gate. The development shall then be constructed in accordance with the approved details and shall be retained and maintained as such at all times."
}
© Crown copyright and database right 2026
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.