Planning condition
Details of roof alterations
About this entity
| Fact links | ||
|---|---|---|
| CURIE | planning-condition:U0125473 | no fact link |
| Prefix | planning-condition | Facts |
| Reference | U0125473 | Facts |
| Name | Details of roof alterations | Facts |
| Quality | Authoritative: We have some data from the authoritative source | no fact link |
| Dataset | Planning condition | no fact link |
| Organisation | Doncaster Metropolitan Borough Council | no fact link |
| Start date | Facts | |
| End date | Facts | |
| Entry date | 2025-06-21 | Facts |
| Typology | policy | no fact link |
| Notes | Unique Condition | Facts |
| Reason | In the interests of preserving and enhancing the signific | Facts |
| Description | All roof alterations and refurbishment to include the link between the 2 roof structures full details of construction materials and appearance of materials should be submitted to and approved in writing by the local planning authority, prior to the commencement of any works to the roof. Where refurbishment works will involve the lifting of existing roof tiles prior to repositioning the same. Any replacement tiles to cover breakages or eroded tiles that cannot be refixed, should match existing tiles and the location of new tiles on the roof slopes should be in a position where they would not harm the appearance of the building. | Facts |
Contents
{
"entry-date": "2025-06-21",
"start-date": "",
"end-date": "",
"entity": 73003054,
"name": "Details of roof alterations",
"dataset": "planning-condition",
"typology": "policy",
"reference": "U0125473",
"prefix": "planning-condition",
"organisation-entity": 109,
"geometry": "",
"point": "",
"quality": "authoritative",
"notes": "Unique Condition",
"reason": "In the interests of preserving and enhancing the signific",
"description": "All roof alterations and refurbishment to include the link between the 2 roof structures full details of construction materials and appearance of materials should be submitted to and approved in writing by the local planning authority, prior to the commencement of any works to the roof. Where refurbishment works will involve the lifting of existing roof tiles prior to repositioning the same. Any replacement tiles to cover breakages or eroded tiles that cannot be refixed, should match existing tiles and the location of new tiles on the roof slopes should be in a position where they would not harm the appearance of the building."
}
© Crown copyright and database right 2026
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.