Planning condition

FRA FFL

About this entity

Fact links
CURIE planning-condition:U0122523 no fact link
Prefix planning-condition Facts
Reference U0122523 Facts
Name FRA FFL Facts
Quality Authoritative: We have some data from the authoritative source no fact link
Dataset Planning condition no fact link
Organisation Doncaster Metropolitan Borough Council no fact link
Start date Facts
End date Facts
Entry date 2025-06-21 Facts
Typology policy no fact link
Notes Unique Condition Facts
Reason To reduce the risk of flooding to the proposed development and future occupants Facts
Description The development shall be carried out in accordance with the submitted flood risk assessment (unreferenced, dated 17th November 2023 and complied by Howard J Wroot) and the following mitigation measures it details: There shall be a 9 metre easement provided between the tackle shop/WC/ and the top of bank of the Woodhouse Sewer (which is often referred to as the 'Diggin Dyke' throughout the application). Finished floor levels shall be set no lower than 3.1 metres above Ordnance Datum (AOD) as per section 5.5 of the FRA Flood resilience measures should be incorporated into the development as detailed within Section 5.5 of the FRA. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development. Facts

Contents

{
        "entry-date": "2025-06-21",
        "start-date": "",
        "end-date": "",
        "entity": 73002889,
        "name": "FRA FFL",
        "dataset": "planning-condition",
        "typology": "policy",
        "reference": "U0122523",
        "prefix": "planning-condition",
        "organisation-entity": 109,
        "geometry": "",
        "point": "",
        "quality": "authoritative",
        "notes": "Unique Condition",
        "reason": "To reduce the risk of flooding to the proposed development and future occupants",
        "description": "The development shall be carried out in accordance with the submitted flood risk assessment (unreferenced, dated 17th November 2023 and complied by Howard J Wroot) and the following mitigation measures it details: There shall be a 9 metre easement provided between the tackle shop/WC/ and the top of bank of the Woodhouse Sewer (which is often referred to as the 'Diggin Dyke' throughout the application). Finished floor levels shall be set no lower than 3.1 metres above Ordnance Datum (AOD) as per section 5.5 of the FRA Flood resilience measures should be incorporated into the development as detailed within Section 5.5 of the FRA. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development."
    }

© Crown copyright and database right 2026

Licensed under the Open Government Licence v.3.0.


Help improve this data

Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.