Planning condition

FRA

About this entity

Fact links
CURIE planning-condition:U0121633 no fact link
Prefix planning-condition Facts
Reference U0121633 Facts
Name FRA Facts
Quality Authoritative: We have some data from the authoritative source no fact link
Dataset Planning condition no fact link
Organisation Doncaster Metropolitan Borough Council no fact link
Start date Facts
End date Facts
Entry date 2025-06-21 Facts
Typology policy no fact link
Notes Unique Condition Facts
Reason To reduce the risk of flooding to the proposed development to prevent flooding elsewhere by ensuring that flood water is not diverted onto others. Facts
Description The development shall be carried out in accordance with the submitted flood risk assessment Flood Risk Assessment by Eastwood Consulting Engineers, referenced 47920, Issue 4, dated 19 March 2024, and the following mitigation measures it details: o Finished floor levels of the battery storage containers, control and transformers shall be set no lower than a minimum of 600mm above adjacent ground levels. o As per Section 2.1.1, in the event of a breach of the main river defences, flood waters will be allowed to enter the site. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development. Facts

Contents

{
        "entry-date": "2025-06-21",
        "start-date": "",
        "end-date": "",
        "entity": 73002764,
        "name": "FRA",
        "dataset": "planning-condition",
        "typology": "policy",
        "reference": "U0121633",
        "prefix": "planning-condition",
        "organisation-entity": 109,
        "geometry": "",
        "point": "",
        "quality": "authoritative",
        "notes": "Unique Condition",
        "reason": "To reduce the risk of flooding to the proposed development to prevent flooding elsewhere by ensuring that flood water is not diverted onto others.",
        "description": "The development shall be carried out in accordance with the submitted flood risk assessment Flood Risk Assessment by Eastwood Consulting Engineers, referenced 47920, Issue 4, dated 19 March 2024, and the following mitigation measures it details: o Finished floor levels of the battery storage containers, control and transformers shall be set no lower than a minimum of 600mm above adjacent ground levels. o As per Section 2.1.1, in the event of a breach of the main river defences, flood waters will be allowed to enter the site. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development."
    }

© Crown copyright and database right 2026

Licensed under the Open Government Licence v.3.0.


Help improve this data

Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.