Planning condition

Ecology - CEMP - Precom

About this entity

Fact links
CURIE planning-condition:U0121620 no fact link
Prefix planning-condition Facts
Reference U0121620 Facts
Name Ecology - CEMP - Precom Facts
Quality Authoritative: We have some data from the authoritative source no fact link
Dataset Planning condition no fact link
Organisation Doncaster Metropolitan Borough Council no fact link
Start date Facts
End date Facts
Entry date 2025-06-21 Facts
Typology policy no fact link
Notes Unique Condition Facts
Reason To protect groundwater and to ensure the ecological interests of the site are maintained in accordance with Policies 26, 29, 55 and 56 of the Local Plan. Facts
Description Prior to the commencement of construction activities, a Construction Environmental Management Plan (CEMP) shall be submitted to and approved in writing by the Local Planning Authority. The CEMP shall provide details of: Contamination 1. Storage and use of fuels and other chemicals. Any liquid storage tanks should be located within a bund with a capacity of not less than 110% of the largest tank or largest combined volume of connected tanks. 2. Designated area with an impermeable ground surface where fuel transfer would take place. 3. Training required for personnel dealing with spillages and spill kits available on site. 4. Details of maintenance regime for the installed equipment to check for drips and spills. 5. Details of grit or oil interceptors installed within the parking area. Ecology 5. A risk assessment of the potentially damaging construction activities 6. A method statement for the protection of reptiles and other terrestrial and aquatic fauna as detailed in the PEA Estrada Ecology 31/03/23 Ref:SQ-942 that may be encountered on site. 7. Details of further water vole and otter surveys prior to works commencing. Facts

Contents

{
        "entry-date": "2025-06-21",
        "start-date": "",
        "end-date": "",
        "entity": 73002751,
        "name": "Ecology - CEMP - Precom",
        "dataset": "planning-condition",
        "typology": "policy",
        "reference": "U0121620",
        "prefix": "planning-condition",
        "organisation-entity": 109,
        "geometry": "",
        "point": "",
        "quality": "authoritative",
        "notes": "Unique Condition",
        "reason": "To protect groundwater and to ensure the ecological interests of the site are maintained in accordance with Policies 26, 29, 55 and 56 of the Local Plan.",
        "description": "Prior to the commencement of construction activities, a Construction Environmental Management Plan (CEMP) shall be submitted to and approved in writing by the Local Planning Authority. The CEMP shall provide details of: Contamination 1. Storage and use of fuels and other chemicals. Any liquid storage tanks should be located within a bund with a capacity of not less than 110% of the largest tank or largest combined volume of connected tanks. 2. Designated area with an impermeable ground surface where fuel transfer would take place. 3. Training required for personnel dealing with spillages and spill kits available on site. 4. Details of maintenance regime for the installed equipment to check for drips and spills. 5. Details of grit or oil interceptors installed within the parking area. Ecology 5. A risk assessment of the potentially damaging construction activities 6. A method statement for the protection of reptiles and other terrestrial and aquatic fauna as detailed in the PEA Estrada Ecology 31/03/23 Ref:SQ-942 that may be encountered on site. 7. Details of further water vole and otter surveys prior to works commencing."
    }

© Crown copyright and database right 2026

Licensed under the Open Government Licence v.3.0.


Help improve this data

Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.