Planning condition
Ecology - CEMP - Precom
About this entity
| Fact links | ||
|---|---|---|
| CURIE | planning-condition:U0121620 | no fact link |
| Prefix | planning-condition | Facts |
| Reference | U0121620 | Facts |
| Name | Ecology - CEMP - Precom | Facts |
| Quality | Authoritative: We have some data from the authoritative source | no fact link |
| Dataset | Planning condition | no fact link |
| Organisation | Doncaster Metropolitan Borough Council | no fact link |
| Start date | Facts | |
| End date | Facts | |
| Entry date | 2025-06-21 | Facts |
| Typology | policy | no fact link |
| Notes | Unique Condition | Facts |
| Reason | To protect groundwater and to ensure the ecological interests of the site are maintained in accordance with Policies 26, 29, 55 and 56 of the Local Plan. | Facts |
| Description | Prior to the commencement of construction activities, a Construction Environmental Management Plan (CEMP) shall be submitted to and approved in writing by the Local Planning Authority. The CEMP shall provide details of: Contamination 1. Storage and use of fuels and other chemicals. Any liquid storage tanks should be located within a bund with a capacity of not less than 110% of the largest tank or largest combined volume of connected tanks. 2. Designated area with an impermeable ground surface where fuel transfer would take place. 3. Training required for personnel dealing with spillages and spill kits available on site. 4. Details of maintenance regime for the installed equipment to check for drips and spills. 5. Details of grit or oil interceptors installed within the parking area. Ecology 5. A risk assessment of the potentially damaging construction activities 6. A method statement for the protection of reptiles and other terrestrial and aquatic fauna as detailed in the PEA Estrada Ecology 31/03/23 Ref:SQ-942 that may be encountered on site. 7. Details of further water vole and otter surveys prior to works commencing. | Facts |
Contents
{
"entry-date": "2025-06-21",
"start-date": "",
"end-date": "",
"entity": 73002751,
"name": "Ecology - CEMP - Precom",
"dataset": "planning-condition",
"typology": "policy",
"reference": "U0121620",
"prefix": "planning-condition",
"organisation-entity": 109,
"geometry": "",
"point": "",
"quality": "authoritative",
"notes": "Unique Condition",
"reason": "To protect groundwater and to ensure the ecological interests of the site are maintained in accordance with Policies 26, 29, 55 and 56 of the Local Plan.",
"description": "Prior to the commencement of construction activities, a Construction Environmental Management Plan (CEMP) shall be submitted to and approved in writing by the Local Planning Authority. The CEMP shall provide details of: Contamination 1. Storage and use of fuels and other chemicals. Any liquid storage tanks should be located within a bund with a capacity of not less than 110% of the largest tank or largest combined volume of connected tanks. 2. Designated area with an impermeable ground surface where fuel transfer would take place. 3. Training required for personnel dealing with spillages and spill kits available on site. 4. Details of maintenance regime for the installed equipment to check for drips and spills. 5. Details of grit or oil interceptors installed within the parking area. Ecology 5. A risk assessment of the potentially damaging construction activities 6. A method statement for the protection of reptiles and other terrestrial and aquatic fauna as detailed in the PEA Estrada Ecology 31/03/23 Ref:SQ-942 that may be encountered on site. 7. Details of further water vole and otter surveys prior to works commencing."
}
© Crown copyright and database right 2026
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.