Skip to main content

This is a new service - your feedback will help us to improve it.

Planning condition

Flood Risk mitigation

About this entity

Fact links
CURIE planning-condition:U0120243 no fact link
Prefix planning-condition Facts
Reference U0120243 Facts
Name Flood Risk mitigation Facts
Quality Authoritative: We have some data from the authoritative source no fact link
Dataset Planning condition no fact link
Organisation Doncaster Metropolitan Borough Council no fact link
Start date Facts
End date Facts
Entry date 2025-06-21 Facts
Typology policy no fact link
Notes Unique Condition Facts
Reason In the interests of flood risk safety and satisfactory drainage, to accord with Local Plan policies 56 and 57 Facts
Description The flood risk mitigation measures as set out in the email in the approved plans list dated 24th August 2023 shall be implemented in full prior to the occupation of any structures granted consent under this permission. These include: - the proposed units are not to be bolted to the floor but are to be of such a robust structure that they do not need to be. - the units are to be placed so that water can run under the units and drain away. - the floor of each unit shall sit 50-100mm above the surface of the car park, allowing flood water to run underneath the units. Facts

Contents

{
        "entry-date": "2025-06-21",
        "start-date": "",
        "end-date": "",
        "entity": 73002596,
        "name": "Flood Risk mitigation",
        "dataset": "planning-condition",
        "typology": "policy",
        "reference": "U0120243",
        "prefix": "planning-condition",
        "organisation-entity": "109",
        "geometry": "",
        "point": "",
        "quality": "authoritative",
        "notes": "Unique Condition",
        "reason": "In the interests of flood risk safety and satisfactory drainage, to accord with Local Plan policies 56 and 57",
        "description": "The flood risk mitigation measures as set out in the email in the approved plans list dated 24th August 2023 shall be implemented in full prior to the occupation of any structures granted consent under this permission. These include: - the proposed units are not to be bolted to the floor but are to be of such a robust structure that they do not need to be. - the units are to be placed so that water can run under the units and drain away. - the floor of each unit shall sit 50-100mm above the surface of the car park, allowing flood water to run underneath the units.",
        "organisation-curie": "local-authority:DNC"
    }

© Crown copyright and database right 2026

Licensed under the Open Government Licence v.3.0.


Help improve this data

Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.