Skip to main content

This is a new service - your feedback will help us to improve it.

Planning condition

CEMP

About this entity

Fact links
CURIE planning-condition:U0118618 no fact link
Prefix planning-condition Facts
Reference U0118618 Facts
Name CEMP Facts
Quality Authoritative: We have some data from the authoritative source no fact link
Dataset Planning condition no fact link
Organisation Doncaster Metropolitan Borough Council no fact link
Start date Facts
End date Facts
Entry date 2025-06-21 Facts
Typology policy no fact link
Notes Unique Condition Facts
Reason This condition is imposed to protect controlled waters, habitats and species on or near the site and to secure the safe removal of invasive species as required by Policies 26, 27, 29, 30 and 54 of the Local Plan. The condition is required to be satisfied prior to the commencement of development to ensure satisfactory controls are in place from the outset. Facts
Description Prior to the commencement of development, a Construction Environmental Management Plan (CEMP) relating to biodiversity shall be submitted to and approved in writing by the Local Planning Authority. The CEMP shall cover badgers, bats, birds, amphibians, other terrestrial mammals and reptiles, and shall include: i) A risk assessment of construction activities in relation to wildlife and habitats informed by the submitted surveys carried out by ECUS ltd and updated protected species surveys where necessary; ii) Details of all reasonable avoidance measures to be employed on the site; iii) A lighting plan detailing the specification, location and orientation of the proposed external lighting to avoid disturbance or adverse effects on light-sensitive species, including bats; iv) An invasive species management plan relating to Himalayan Balsam, Buddleia and Horsetail; v) The use of protective fencing and wildlife safety measures clearly marked on site plans; vi) Temporary surface water controls to ensure that no surface water generated during construction of the development are discharged to ground; vii Details of any liquid storage tanks and necessary mitigation measures. Any liquid storage tanks should be located within a bund with a capacity of not less than 110% of the largest tank or largest combined volume of connected tanks. viii) Plans for a record to be kept by an Ecological Clerk of Works of operations and monitoring activities carried out under the CEMP. This record shall be made available to the Local Planning Authority on request both during and after the construction period. The development shall thereafter be implemented in accordance with the approved CEMP. Facts

Contents

{
        "entry-date": "2025-06-21",
        "start-date": "",
        "end-date": "",
        "entity": 73002385,
        "name": "CEMP",
        "dataset": "planning-condition",
        "typology": "policy",
        "reference": "U0118618",
        "prefix": "planning-condition",
        "organisation-entity": "109",
        "geometry": "",
        "point": "",
        "quality": "authoritative",
        "notes": "Unique Condition",
        "reason": "This condition is imposed to protect controlled waters, habitats and species on or near the site and to secure the safe removal of invasive species as required by Policies 26, 27, 29, 30 and 54 of the Local Plan. The condition is required to be satisfied prior to the commencement of development to ensure satisfactory controls are in place from the outset.",
        "description": "Prior to the commencement of development, a Construction Environmental Management Plan (CEMP) relating to biodiversity shall be submitted to and approved in writing by the Local Planning Authority. The CEMP shall cover badgers, bats, birds, amphibians, other terrestrial mammals and reptiles, and shall include: i) A risk assessment of construction activities in relation to wildlife and habitats informed by the submitted surveys carried out by ECUS ltd and updated protected species surveys where necessary; ii) Details of all reasonable avoidance measures to be employed on the site; iii) A lighting plan detailing the specification, location and orientation of the proposed external lighting to avoid disturbance or adverse effects on light-sensitive species, including bats; iv) An invasive species management plan relating to Himalayan Balsam, Buddleia and Horsetail; v) The use of protective fencing and wildlife safety measures clearly marked on site plans; vi) Temporary surface water controls to ensure that no surface water generated during construction of the development are discharged to ground; vii Details of any liquid storage tanks and necessary mitigation measures. Any liquid storage tanks should be located within a bund with a capacity of not less than 110% of the largest tank or largest combined volume of connected tanks. viii) Plans for a record to be kept by an Ecological Clerk of Works of operations and monitoring activities carried out under the CEMP. This record shall be made available to the Local Planning Authority on request both during and after the construction period. The development shall thereafter be implemented in accordance with the approved CEMP.",
        "organisation-curie": "local-authority:DNC"
    }

© Crown copyright and database right 2026

Licensed under the Open Government Licence v.3.0.


Help improve this data

Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.