Skip to main content

This is a new service - your feedback will help us to improve it.

Planning condition

Construction Management Plan inc. hi,eho

About this entity

Fact links
CURIE planning-condition:U0118617 no fact link
Prefix planning-condition Facts
Reference U0118617 Facts
Name Construction Management Plan inc. hi,eho Facts
Quality Authoritative: We have some data from the authoritative source no fact link
Dataset Planning condition no fact link
Organisation Doncaster Metropolitan Borough Council no fact link
Start date Facts
End date Facts
Entry date 2025-06-21 Facts
Typology policy no fact link
Notes Unique Condition Facts
Reason This condition is to ensure that local amenity is protected as required by Policy 46 of the Local Plan. The condition is required to be satisfied prior to the commencement of development to ensure satisfactory controls are in place from the outset. Facts
Description No development, including any works of demolition, shall take place on site until a Construction Traffic Management Plan (CTMP) has been submitted to and approved in writing by the local planning authority. The approved statement shall be adhered to throughout the construction period. The statement shall provide for: 1. The site compound and parking of vehicles for site operatives and visitors 2. Identification of agreed access points and routing from the Classified road network 3. Timings, volumes and types of construction/delivery vehicles (incl abnormal loads with swept path analysis) 4. Contract duration 5. The areas for loading and unloading of plant and materials 6. Storage of plant and materials used in constructing the development 7. The location, erection and maintenance of any security hoarding to be installed 8. Wheel washing facilities (location and type) 9. Temporary signage on the adopted highway 10. Assessment of impact and measures to control noise and vibration from site activities 11. Assessment of impact and measures to control the emission of dust, mud and dirt from the site 12. Assessment of impact and measures to control the emission of volatile organic compounds and odour from the site 13. Details of artificial lighting and mitigation measures 14. Complaints procedure - to detail how a contact number will be advertised to the public, investigation procedure when a complaint is received, any monitoring to be carried out, and what will happen in the event that the complaint is not resolved. The development must be carried out in accordance with the Construction Traffic Management Plan for the lifetime of the development. Facts

Contents

{
        "entry-date": "2025-06-21",
        "start-date": "",
        "end-date": "",
        "entity": 73002384,
        "name": "Construction Management Plan inc. hi,eho",
        "dataset": "planning-condition",
        "typology": "policy",
        "reference": "U0118617",
        "prefix": "planning-condition",
        "organisation-entity": "109",
        "geometry": "",
        "point": "",
        "quality": "authoritative",
        "notes": "Unique Condition",
        "reason": "This condition is to ensure that local amenity is protected as required by Policy 46 of the Local Plan. The condition is required to be satisfied prior to the commencement of development to ensure satisfactory controls are in place from the outset.",
        "description": "No development, including any works of demolition, shall take place on site until a Construction Traffic Management Plan (CTMP) has been submitted to and approved in writing by the local planning authority. The approved statement shall be adhered to throughout the construction period. The statement shall provide for: 1. The site compound and parking of vehicles for site operatives and visitors 2. Identification of agreed access points and routing from the Classified road network 3. Timings, volumes and types of construction/delivery vehicles (incl abnormal loads with swept path analysis) 4. Contract duration 5. The areas for loading and unloading of plant and materials 6. Storage of plant and materials used in constructing the development 7. The location, erection and maintenance of any security hoarding to be installed 8. Wheel washing facilities (location and type) 9. Temporary signage on the adopted highway 10. Assessment of impact and measures to control noise and vibration from site activities 11. Assessment of impact and measures to control the emission of dust, mud and dirt from the site 12. Assessment of impact and measures to control the emission of volatile organic compounds and odour from the site 13. Details of artificial lighting and mitigation measures 14. Complaints procedure - to detail how a contact number will be advertised to the public, investigation procedure when a complaint is received, any monitoring to be carried out, and what will happen in the event that the complaint is not resolved. The development must be carried out in accordance with the Construction Traffic Management Plan for the lifetime of the development.",
        "organisation-curie": "local-authority:DNC"
    }

© Crown copyright and database right 2026

Licensed under the Open Government Licence v.3.0.


Help improve this data

Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.