Planning condition
Construction Management Plan inc. hi,eho
About this entity
| Fact links | ||
|---|---|---|
| CURIE | planning-condition:U0118617 | no fact link |
| Prefix | planning-condition | Facts |
| Reference | U0118617 | Facts |
| Name | Construction Management Plan inc. hi,eho | Facts |
| Quality | Authoritative: We have some data from the authoritative source | no fact link |
| Dataset | Planning condition | no fact link |
| Organisation | Doncaster Metropolitan Borough Council | no fact link |
| Start date | Facts | |
| End date | Facts | |
| Entry date | 2025-06-21 | Facts |
| Typology | policy | no fact link |
| Notes | Unique Condition | Facts |
| Reason | This condition is to ensure that local amenity is protected as required by Policy 46 of the Local Plan. The condition is required to be satisfied prior to the commencement of development to ensure satisfactory controls are in place from the outset. | Facts |
| Description | No development, including any works of demolition, shall take place on site until a Construction Traffic Management Plan (CTMP) has been submitted to and approved in writing by the local planning authority. The approved statement shall be adhered to throughout the construction period. The statement shall provide for: 1. The site compound and parking of vehicles for site operatives and visitors 2. Identification of agreed access points and routing from the Classified road network 3. Timings, volumes and types of construction/delivery vehicles (incl abnormal loads with swept path analysis) 4. Contract duration 5. The areas for loading and unloading of plant and materials 6. Storage of plant and materials used in constructing the development 7. The location, erection and maintenance of any security hoarding to be installed 8. Wheel washing facilities (location and type) 9. Temporary signage on the adopted highway 10. Assessment of impact and measures to control noise and vibration from site activities 11. Assessment of impact and measures to control the emission of dust, mud and dirt from the site 12. Assessment of impact and measures to control the emission of volatile organic compounds and odour from the site 13. Details of artificial lighting and mitigation measures 14. Complaints procedure - to detail how a contact number will be advertised to the public, investigation procedure when a complaint is received, any monitoring to be carried out, and what will happen in the event that the complaint is not resolved. The development must be carried out in accordance with the Construction Traffic Management Plan for the lifetime of the development. | Facts |
Contents
{
"entry-date": "2025-06-21",
"start-date": "",
"end-date": "",
"entity": 73002384,
"name": "Construction Management Plan inc. hi,eho",
"dataset": "planning-condition",
"typology": "policy",
"reference": "U0118617",
"prefix": "planning-condition",
"organisation-entity": "109",
"geometry": "",
"point": "",
"quality": "authoritative",
"notes": "Unique Condition",
"reason": "This condition is to ensure that local amenity is protected as required by Policy 46 of the Local Plan. The condition is required to be satisfied prior to the commencement of development to ensure satisfactory controls are in place from the outset.",
"description": "No development, including any works of demolition, shall take place on site until a Construction Traffic Management Plan (CTMP) has been submitted to and approved in writing by the local planning authority. The approved statement shall be adhered to throughout the construction period. The statement shall provide for: 1. The site compound and parking of vehicles for site operatives and visitors 2. Identification of agreed access points and routing from the Classified road network 3. Timings, volumes and types of construction/delivery vehicles (incl abnormal loads with swept path analysis) 4. Contract duration 5. The areas for loading and unloading of plant and materials 6. Storage of plant and materials used in constructing the development 7. The location, erection and maintenance of any security hoarding to be installed 8. Wheel washing facilities (location and type) 9. Temporary signage on the adopted highway 10. Assessment of impact and measures to control noise and vibration from site activities 11. Assessment of impact and measures to control the emission of dust, mud and dirt from the site 12. Assessment of impact and measures to control the emission of volatile organic compounds and odour from the site 13. Details of artificial lighting and mitigation measures 14. Complaints procedure - to detail how a contact number will be advertised to the public, investigation procedure when a complaint is received, any monitoring to be carried out, and what will happen in the event that the complaint is not resolved. The development must be carried out in accordance with the Construction Traffic Management Plan for the lifetime of the development.",
"organisation-curie": "local-authority:DNC"
}
© Crown copyright and database right 2026
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.