Planning condition
Mud on highway
About this entity
| Fact links | ||
|---|---|---|
| CURIE | planning-condition:U0117868 | no fact link |
| Prefix | planning-condition | Facts |
| Reference | U0117868 | Facts |
| Name | Mud on highway | Facts |
| Quality | Authoritative: We have some data from the authoritative source | no fact link |
| Dataset | Planning condition | no fact link |
| Organisation | Doncaster Metropolitan Borough Council | no fact link |
| Start date | Facts | |
| End date | Facts | |
| Entry date | 2025-06-21 | Facts |
| Typology | policy | no fact link |
| Notes | Unique Condition | Facts |
| Reason | In the interests of preventing mud from being deposited on the highway to protect highway safety. | Facts |
| Description | No waste shall be deposited at the site until details of measures to prevent the deposit of mud on the public highway have been submitted to and approved in writing by the Waste Planning Authority. The approved measures shall be provided before any works are commenced on site. In the event that the access arrangements fail to prevent mud being carried on to the public highway, the operator shall submit for the written approval of the Mineral Planning Authority a scheme detailing measures to be taken to prevent the deposit of mud on to the public highway and thereafter implement and utilise the approved scheme for the duration of all operations on the site. | Facts |
Contents
{
"entry-date": "2025-06-21",
"start-date": "",
"end-date": "",
"entity": 73002214,
"name": "Mud on highway",
"dataset": "planning-condition",
"typology": "policy",
"reference": "U0117868",
"prefix": "planning-condition",
"organisation-entity": "109",
"geometry": "",
"point": "",
"quality": "authoritative",
"notes": "Unique Condition",
"reason": "In the interests of preventing mud from being deposited on the highway to protect highway safety.",
"description": "No waste shall be deposited at the site until details of measures to prevent the deposit of mud on the public highway have been submitted to and approved in writing by the Waste Planning Authority. The approved measures shall be provided before any works are commenced on site. In the event that the access arrangements fail to prevent mud being carried on to the public highway, the operator shall submit for the written approval of the Mineral Planning Authority a scheme detailing measures to be taken to prevent the deposit of mud on to the public highway and thereafter implement and utilise the approved scheme for the duration of all operations on the site.",
"organisation-curie": "local-authority:DNC"
}
© Crown copyright and database right 2026
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.