Planning condition
Importation time limit
About this entity
| Fact links | ||
|---|---|---|
| CURIE | planning-condition:U0117864 | no fact link |
| Prefix | planning-condition | Facts |
| Reference | U0117864 | Facts |
| Name | Importation time limit | Facts |
| Quality | Authoritative: We have some data from the authoritative source | no fact link |
| Dataset | Planning condition | no fact link |
| Organisation | Doncaster Metropolitan Borough Council | no fact link |
| Start date | Facts | |
| End date | Facts | |
| Entry date | 2025-06-21 | Facts |
| Typology | policy | no fact link |
| Notes | Unique Condition | Facts |
| Reason | To ensure that the tipping operations are tied to the planning permission in the interests of protecting the South Yorkshire Green Belt and local amenity. | Facts |
| Description | The importation of permitted material (inert and non-hazardous construction, demolition and excavation material deemed suitable for disposal within an agreed environmental permit) into the site shall be completed no later than five years from the date of commencement of importation as notified to the Waste Planning Authority under condition 3. The Waste Planning Authority shall be notified in writing of the date of cessation of the importation of restoration material into the site within 14 days of its occurrence. | Facts |
Contents
{
"entry-date": "2025-06-21",
"start-date": "",
"end-date": "",
"entity": 73002210,
"name": "Importation time limit",
"dataset": "planning-condition",
"typology": "policy",
"reference": "U0117864",
"prefix": "planning-condition",
"organisation-entity": "109",
"geometry": "",
"point": "",
"quality": "authoritative",
"notes": "Unique Condition",
"reason": "To ensure that the tipping operations are tied to the planning permission in the interests of protecting the South Yorkshire Green Belt and local amenity.",
"description": "The importation of permitted material (inert and non-hazardous construction, demolition and excavation material deemed suitable for disposal within an agreed environmental permit) into the site shall be completed no later than five years from the date of commencement of importation as notified to the Waste Planning Authority under condition 3. The Waste Planning Authority shall be notified in writing of the date of cessation of the importation of restoration material into the site within 14 days of its occurrence.",
"organisation-curie": "local-authority:DNC"
}
© Crown copyright and database right 2026
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.