Planning condition

EA 3

Field Value Fact links
CURIE planning-condition:U0111959 no fact link
Prefix planning-condition Facts
Reference U0111959 Facts
Name EA 3 Facts
Dataset Planning condition no fact link
Organisation Doncaster Metropolitan Borough Council no fact link
Start date no fact link
End date no fact link
Entry date 2025-02-25 Facts
Typology policy no fact link
Notes Unique Condition Facts
Reason To protect the River Torne and surface waters within and around the development site and avoid damaging the site's nature conservation value. Facts
Description Within one month of the date of this permission, a plan for the mitigation of damage to the water quality in the River Torne or surface waters both during construction works and once the development is complete, shall be submitted for approval in writing by the Local Planning Authority. The surface waters protection plan shall be carried out in accordance with a timetable for implementation as approved. The scheme shall include the following elements; - details of sediment management techniques that will be used during construction to prevent silt ingress into the watercourse - details of the likely pollutants expected to enter surface waters as a result of direct run-off from the new road and any mitigation required to prevent adverse impacts on water quality.= Facts

Contents

{
        "curie": "planning-condition:U0111959",
        "prefix": "planning-condition",
        "reference": "U0111959",
        "name": "EA 3",
        "dataset": "planning-condition",
        "organisation-entity": "local-authority:DNC",
        "start-date": "",
        "end-date": "",
        "entry-date": "2025-02-25",
        "typology": "policy",
        "geometry": "",
        "point": "",
        "entity": 73000979,
        "quality": "some",
        "notes": "Unique Condition",
        "reason": "To protect the River Torne and surface waters within and around the development site and avoid damaging the site's nature conservation value.",
        "description": "Within one month of the date of this permission, a plan for the mitigation of damage to the water quality in the River Torne or surface waters both during construction works and once the development is complete, shall be submitted for approval in writing by the Local Planning Authority. The surface waters protection plan shall be carried out in accordance with a timetable for implementation as approved. The scheme shall include the following elements; - details of sediment management techniques that will be used during construction to prevent silt ingress into the watercourse - details of the likely pollutants expected to enter surface waters as a result of direct run-off from the new road and any mitigation required to prevent adverse impacts on water quality.="
    }

© Crown copyright and database right 2026