Approved Plans

Field Value Fact links
CURIE planning-condition:U0111956 no fact link
Prefix planning-condition Facts
Reference U0111956 Facts
Name Approved Plans Facts
Dataset Planning condition no fact link
Organisation Doncaster Metropolitan Borough Council no fact link
Start date no fact link
End date no fact link
Entry date 2025-02-25 Facts
Typology policy no fact link
Notes Unique Condition Facts
Reason To ensure that the development is carried out in accordance with the application as approved. Facts
Description he development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: AJA-RP2-KP-B-025 Rev P02 - Gatehouse GA Plan & Roof AJA-RP2-KP-B-026 Rev P02 - Gatehouse Elevations & Section AJA-RP2-KP-B-027 Rev P01 - Welfare GA Plan & Roof AJA-RP2-KP-B-028 Rev P01 - Welfare Elevations & Section AJA-RP2-KP-B-029 Rev P01 - Existing Site Plan AJA-RP2-KP-B-034 Rev P02 - Site Location Plan AJA-RP2-KP-B-035 Rev P03 - Proposed Railport Site Plan AJA-RP2-KP-B-036 Rev P02 - Proposed Site Build Out Plan DWG. No 5045_2111_B General Arrangement Soft Landscape Proposal - Railport Way Expansion (Sheet 1 of 3) DWG. No 5045_2112_B General Arrangement Soft Landscape Proposal - Railport Way Expansion (Sheet 2 of 3) DWG. No 5045_2113_C General Arrangement Soft Landscape Proposal - Railport Way Expansion (Sheet 3 of 3) Drawing No. 2302016MHF - Lighting Schedule prepared by Lighting Project Solutions IP-BWB-DDG-RP2-DR-C-0540 Rev P1 Railport Phase 2 Flood Routing Plan IP-BWB-GEN-RP2-DR-C-0050 Rev P1 Railport Phase 2 Existing & Proposed Impermeable Area Plan IP-BWB-DGT-RP-CL-C-0500 Rev P1 Microdrainage Calculations IP-BWB-DDG-IS-DR-C-0500 Rev C1 - DIP Phase 2 Proposed Drainage Key Plan IP-BWB-DGT-RP2-DR-C-0690 Rev P1 - Proposed Finished Floor Levels IP-BWB-DDG-RP2-DR-C-0555 Rev P1 - Site Wide Maintenance Strategy for Surface and Foul Water Infrastructure Drainage - Sheet 1 DIP-BWB-00-XX-DR-EN-0002_FRA Flood Risk Assessment & Management Addendum Report IP-BWB-GEN-XX-RP-CE-0010_S2-P1 - Drainage Statement for Railport Phase 2 IP_BWB-GEN-XX-RP-TR-0001_S2 P1-TS - Transport Statement Design and Access Statement Revision P01-06-02-2023, prepared by AJA Environmental Management Plan Ref GP.1202.F01, May 2023 prepared by Buckingham Group Contracting Environmental Compliance Report Railport Phase 2, April 2023 prepared by RPS Rail Terminal Landscape and Visual Assessment, June 2023 prepared by LDA Design Ecological Assessment, February 2023 prepared by Ecology Solutions Planning Statement, March 2023 prepared by RPS Facts

Contents

{
        "curie": "planning-condition:U0111956",
        "prefix": "planning-condition",
        "reference": "U0111956",
        "name": "Approved Plans",
        "dataset": "planning-condition",
        "organisation-entity": "local-authority:DNC",
        "start-date": "",
        "end-date": "",
        "entry-date": "2025-02-25",
        "typology": "policy",
        "geometry": "",
        "point": "",
        "entity": 73000976,
        "quality": "some",
        "notes": "Unique Condition",
        "reason": "To ensure that the development is carried out in accordance with the application as approved.",
        "description": "he development hereby permitted must be carried out and completed entirely in accordance with the terms of this permission and the details shown on the approved plans listed below: AJA-RP2-KP-B-025 Rev P02 - Gatehouse GA Plan & Roof AJA-RP2-KP-B-026 Rev P02 - Gatehouse Elevations & Section AJA-RP2-KP-B-027 Rev P01 - Welfare GA Plan & Roof AJA-RP2-KP-B-028 Rev P01 - Welfare Elevations & Section AJA-RP2-KP-B-029 Rev P01 - Existing Site Plan AJA-RP2-KP-B-034 Rev P02 - Site Location Plan AJA-RP2-KP-B-035 Rev P03 - Proposed Railport Site Plan AJA-RP2-KP-B-036 Rev P02 - Proposed Site Build Out Plan DWG. No 5045_2111_B General Arrangement Soft Landscape Proposal - Railport Way Expansion (Sheet 1 of 3) DWG. No 5045_2112_B General Arrangement Soft Landscape Proposal - Railport Way Expansion (Sheet 2 of 3) DWG. No 5045_2113_C General Arrangement Soft Landscape Proposal - Railport Way Expansion (Sheet 3 of 3) Drawing No. 2302016MHF - Lighting Schedule prepared by Lighting Project Solutions IP-BWB-DDG-RP2-DR-C-0540 Rev P1 Railport Phase 2 Flood Routing Plan IP-BWB-GEN-RP2-DR-C-0050 Rev P1 Railport Phase 2 Existing & Proposed Impermeable Area Plan IP-BWB-DGT-RP-CL-C-0500 Rev P1 Microdrainage Calculations IP-BWB-DDG-IS-DR-C-0500 Rev C1 - DIP Phase 2 Proposed Drainage Key Plan IP-BWB-DGT-RP2-DR-C-0690 Rev P1 - Proposed Finished Floor Levels IP-BWB-DDG-RP2-DR-C-0555 Rev P1 - Site Wide Maintenance Strategy for Surface and Foul Water Infrastructure Drainage - Sheet 1 DIP-BWB-00-XX-DR-EN-0002_FRA Flood Risk Assessment & Management Addendum Report IP-BWB-GEN-XX-RP-CE-0010_S2-P1 - Drainage Statement for Railport Phase 2 IP_BWB-GEN-XX-RP-TR-0001_S2 P1-TS - Transport Statement Design and Access Statement Revision P01-06-02-2023, prepared by AJA Environmental Management Plan Ref GP.1202.F01, May 2023 prepared by Buckingham Group Contracting Environmental Compliance Report Railport Phase 2, April 2023 prepared by RPS Rail Terminal Landscape and Visual Assessment, June 2023 prepared by LDA Design Ecological Assessment, February 2023 prepared by Ecology Solutions Planning Statement, March 2023 prepared by RPS"
    }

© Crown copyright and database right 2026

Licensed under the Open Government Licence v.3.0.


Help improve this data

Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.