Planning condition
FRA Compliance
Field | Value | Fact links |
---|---|---|
Reference | U0110696 | Facts |
Prefix | planning-condition | Facts |
Name | FRA Compliance | Facts |
Dataset | Planning condition | no fact link |
Organisation | Doncaster Metropolitan Borough Council | no fact link |
Start date | no fact link | |
End date | no fact link | |
Entry date | 2025-02-25 | Facts |
Typology | policy | no fact link |
Notes | Unique Condition | Facts |
Reason | To reduce the risk of flooding to the proposed development and future occupants. | Facts |
Description | The development shall be carried out in accordance with the submitted flood risk assessment by J Roberts Design Ltd, reference 3888 Rev A dated May 2023, and the following mitigation measures it details: - Finished floor levels shall be set no lower than 2.9 metres above Ordnance Datum (mAOD) - Critical infrastructure will be raised to a minimum of 5.3m AOD - Appendix G Flood Warning and Evacuation Plan These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development. | Facts |
Contents
{
"reference": "U0110696",
"prefix": "planning-condition",
"name": "FRA Compliance",
"dataset": "planning-condition",
"organisation-entity": "109",
"start-date": "",
"end-date": "",
"entry-date": "2025-02-25",
"typology": "policy",
"geometry": "",
"point": "",
"entity": 73000741,
"notes": "Unique Condition",
"reason": "To reduce the risk of flooding to the proposed development and future occupants.",
"description": "The development shall be carried out in accordance with the submitted flood risk assessment by J Roberts Design Ltd, reference 3888 Rev A dated May 2023, and the following mitigation measures it details: - Finished floor levels shall be set no lower than 2.9 metres above Ordnance Datum (mAOD) - Critical infrastructure will be raised to a minimum of 5.3m AOD - Appendix G Flood Warning and Evacuation Plan These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme's timing/ phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development."
}
© Crown copyright and database right 2025
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.