Planning condition

Y Water

Field Value Fact links
Reference U0110424 Facts
Prefix planning-condition Facts
Name Y Water Facts
Dataset Planning condition no fact link
Organisation Doncaster Metropolitan Borough Council no fact link
Start date no fact link
End date no fact link
Entry date 2025-02-25 Facts
Typology policy no fact link
Notes Unique Condition Facts
Reason In the interest of public health and maintaining the public sewer network Facts
Description In the instance of the 450mm public combined sewer, no building or other obstruction including landscape features shall be located over or within 3.5 metres either side of the centre line of the public sewer i.e. a protected strip width of 7 metres, that crosses the site. Furthermore, no construction works in the relevant area(s) of the site shall commence until measures to protect the public sewerage infrastructure that is laid within the site boundary have been implemented in full accordance with details that have been submitted to and approved by the Local Planning Authority. The details shall include but not be exclusive to the means of ensuring that access to the pipe for the purposes of repair and maintenance by the statutory undertaker shall be retained at all times. If the required stand-off or protection measures are to be achieved via diversion or closure of the sewer, the developer shall submit evidence to the Local Planning Authority that the diversion or closure has been agreed with the relevant statutory undertaker and that, prior to construction in the affected area, the approved works have been undertaken. Facts

Contents

{
    "reference": "U0110424",
    "prefix": "planning-condition",
    "name": "Y Water",
    "dataset": "planning-condition",
    "organisation-entity": "109",
    "start-date": "",
    "end-date": "",
    "entry-date": "2025-02-25",
    "typology": "policy",
    "geometry": "",
    "point": "",
    "entity": 73000651,
    "notes": "Unique Condition",
    "reason": "In the interest of public health and maintaining the public sewer network",
    "description": "In the instance of the 450mm public combined sewer, no building or other obstruction including landscape features shall be located over or within 3.5 metres either side of the centre line of the public sewer i.e. a protected strip width of 7 metres, that crosses the site. Furthermore, no construction works in the relevant area(s) of the site shall commence until measures to protect the public sewerage infrastructure that is laid within the site boundary have been implemented in full accordance with details that have been submitted to and approved by the Local Planning Authority. The details shall include but not be exclusive to the means of ensuring that access to the pipe for the purposes of repair and maintenance by the statutory undertaker shall be retained at all times. If the required stand-off or protection measures are to be achieved via diversion or closure of the sewer, the developer shall submit evidence to the Local Planning Authority that the diversion or closure has been agreed with the relevant statutory undertaker and that, prior to construction in the affected area, the approved works have been undertaken."
}

© Crown copyright and database right 2025

Licensed under the Open Government Licence v.3.0.


Help improve this data

Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.