Article 4 direction area
Bell Hill, Ibberton
Geographical area
About this entity
| Fact links | ||
|---|---|---|
| CURIE | article-4-direction-area:Art4D45 | no fact link |
| Prefix | article-4-direction-area | Facts about Prefix |
| Reference | Art4D45 | Facts about Reference |
| Name | Bell Hill, Ibberton | Facts about Name |
| Quality | Authoritative: We have some data from the authoritative source | no fact link |
| Dataset | Article 4 direction area | no fact link |
| Organisation | Dorset Council | no fact link |
| Start date | 1990-05-01 | Facts about Start date |
| End date | Facts about End date | |
| Entry date | 1990-04-24 | Facts about Entry date |
| Typology | geography | no fact link |
| Geometry |
MULTIPOLYGON (((-2.29316 50.872215, -2.293159 50.872077, -2.2932 50.871924, -2.293269 50.871595, -2.293316 50.871339, -2.293406 50.870985, -2.293454 50.870759, -2.293516 50.870523, -2.293578 50.870365, -2.293683 50.870203, -2.293802 50.870026, -2.293962 50.869809, -2.294053 50.869656, -2.294123 50.869523, -2.29415 50.869385, -2.294142 50.869214, -2.29412 50.869095, -2.294048 50.868869, -2.29404 50.868756, -2.29404 50.868702, -2.293955 50.868663, -2.293801 50.868727, -2.293379 50.868984, -2.29274 50.869354, -2.29222 50.869636, -2.291798 50.869843, -2.291412 50.870026, -2.291307 50.87009, -2.291138 50.870169, -2.290618 50.870382, -2.290259 50.870531, -2.290048 50.870639, -2.289943 50.870704, -2.28981 50.870792, -2.289599 50.870921, -2.289882 50.871063, -2.290164 50.871185, -2.290475 50.871327, -2.290723 50.871419, -2.291182 50.871576, -2.291408 50.871668, -2.291599 50.871717, -2.291853 50.871795, -2.2921 50.871898, -2.292221 50.871961, -2.292425 50.872074, -2.292489 50.872093, -2.292701 50.872132, -2.292877 50.872181, -2.293068 50.872205, -2.29316 50.87222, -2.29316 50.872215)))
|
Facts about Geometry |
| Point |
POINT (-2.292282 50.870591)
|
Facts about Point |
| Article 4 direction | article_4.Art4D45 | Facts about Article 4 direction |
| Permitted development rights | Article 4 Direction in respect of Town and Country Planning General Development Order 1988 - 1. The erection, construction, maintenance, improvement or alteration of a gate, fence, wall or other means of enclosure being development comprised within Part 2 Class A referred to in Schedule 2 to the said Order and not being development comprised within any other Part. 2. The formation, laying out and construction of a means of access to a highway which is not a trunk road or a classified road, where that access is required in connection with development permitted by any class in Schedule 2 (other than by Class A of Part 2) to the Town and Country General Development Order 1988 being development comprised within Part 2 Class B referred· to in Schedule 2 to the said Order and not being development comprised within any other Part. 3. The provision on land of buildings, moveable structures, works, plant or machinery required temporarily in connection with and for the duration of operations being or to be carried out on, in, under or over that land or on land adjoining that land being development comprised within Part 4 Class A referred to in Schedule 2 to the said Order and not being development comprised within any other Part. 4. The use of any land for any purpose for not more than 28 days in total in any calendar year, of which not more than 14 days in total may be for the purposes referred to in paragraph B.2, of Class Bin Part 4 of Schedule 2 to the Town and Country General Development Order 1988 and the provision on the land of any moveable structure for the purposes of the permitted use being development comprised within Part 4 Class B referred to in Schedule 2 to the said Order and not being development comprised within any other Part. 5. The use of land, other than a building, as a caravan site in the circumstances referred to in paragraph A.2. of Class A in Part 5 of Schedule 2 to the Town and Country General Development Order 1988 being development comprised within Part 5 Class A referred to in Schedule 2 to the said Order and not being development comprised within any other Part. 6. Development required by the conditions of a site licence for the time being in force under the Caravan Sites and Control of Development Act 1960 being development comprised within Part 5 Class B referred to in Schedule 2 to the said Order and not being development comprised within any other Part. 7. The carrying out on agricultural land comprised in an agricultural unit of - (a) works for the erection, extension or alteration of a building, or (b) any excavation or engineering operations, reasonably necessary for the purposes of agriculture within that unit, being development comprised within Part 6 Class A referred to in Schedule 2 to the said Order and not being development comprised within any other part. | Facts about Permitted development rights |
Available Code Snippets:
{
"entry-date": "1990-04-24",
"start-date": "1990-05-01",
"end-date": "",
"entity": 7010007387,
"name": "Bell Hill, Ibberton",
"dataset": "article-4-direction-area",
"typology": "geography",
"reference": "Art4D45",
"prefix": "article-4-direction-area",
"organisation-entity": 112,
"geometry": "MULTIPOLYGON (((-2.29316 50.872215, -2.293159 50.872077, -2.2932 50.871924, -2.293269 50.871595, -2.293316 50.871339, -2.293406 50.870985, -2.293454 50.870759, -2.293516 50.870523, -2.293578 50.870365, -2.293683 50.870203, -2.293802 50.870026, -2.293962 50.869809, -2.294053 50.869656, -2.294123 50.869523, -2.29415 50.869385, -2.294142 50.869214, -2.29412 50.869095, -2.294048 50.868869, -2.29404 50.868756, -2.29404 50.868702, -2.293955 50.868663, -2.293801 50.868727, -2.293379 50.868984, -2.29274 50.869354, -2.29222 50.869636, -2.291798 50.869843, -2.291412 50.870026, -2.291307 50.87009, -2.291138 50.870169, -2.290618 50.870382, -2.290259 50.870531, -2.290048 50.870639, -2.289943 50.870704, -2.28981 50.870792, -2.289599 50.870921, -2.289882 50.871063, -2.290164 50.871185, -2.290475 50.871327, -2.290723 50.871419, -2.291182 50.871576, -2.291408 50.871668, -2.291599 50.871717, -2.291853 50.871795, -2.2921 50.871898, -2.292221 50.871961, -2.292425 50.872074, -2.292489 50.872093, -2.292701 50.872132, -2.292877 50.872181, -2.293068 50.872205, -2.29316 50.87222, -2.29316 50.872215)))",
"point": "POINT (-2.292282 50.870591)",
"quality": "authoritative",
"article-4-direction": "article_4.Art4D45",
"permitted-development-rights": "Article 4 Direction in respect of Town and Country Planning General Development Order 1988 - 1. The erection, construction, maintenance, improvement or alteration of a gate, fence, wall or other means of enclosure being development comprised within Part 2 Class A referred to in Schedule 2 to the said Order and not being development comprised within any other Part. 2. The formation, laying out and construction of a means of access to a highway which is not a trunk road or a classified road, where that access is required in connection with development permitted by any class in Schedule 2 (other than by Class A of Part 2) to the Town and Country General Development Order 1988 being development comprised within Part 2 Class B referred\u00b7 to in Schedule 2 to the said Order and not being development comprised within any other Part. 3. The provision on land of buildings, moveable structures, works, plant or machinery required temporarily in connection with and for the duration of operations being or to be carried out on, in, under or over that land or on land adjoining that land being development comprised within Part 4 Class A referred to in Schedule 2 to the said Order and not being development comprised within any other Part. 4. The use of any land for any purpose for not more than 28 days in total in any calendar year, of which not more than 14 days in total may be for the purposes referred to in paragraph B.2, of Class Bin Part 4 of Schedule 2 to the Town and Country General Development Order 1988 and the provision on the land of any moveable structure for the purposes of the permitted use being development comprised within Part 4 Class B referred to in Schedule 2 to the said Order and not being development comprised within any other Part. 5. The use of land, other than a building, as a caravan site in the circumstances referred to in paragraph A.2. of Class A in Part 5 of Schedule 2 to the Town and Country General Development Order 1988 being development comprised within Part 5 Class A referred to in Schedule 2 to the said Order and not being development comprised within any other Part. 6. Development required by the conditions of a site licence for the time being in force under the Caravan Sites and Control of Development Act 1960 being development comprised within Part 5 Class B referred to in Schedule 2 to the said Order and not being development comprised within any other Part. 7. The carrying out on agricultural land comprised in an agricultural unit of - (a) works for the erection, extension or alteration of a building, or (b) any excavation or engineering operations, reasonably necessary for the purposes of agriculture within that unit, being development comprised within Part 6 Class A referred to in Schedule 2 to the said Order and not being development comprised within any other part."
}
Loading...
© Crown copyright and database right 2026
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.