Brownfield land
OIS8c
Geographical area
About this entity
| Fact links | ||
|---|---|---|
| CURIE | brownfield-land:OIS8c | no fact link |
| Prefix | brownfield-land | Facts about Prefix |
| Reference | OIS8c | Facts about Reference |
| Name | OIS8c | Facts about Name |
| Quality | Some: We have some data from an alternative source | no fact link |
| Dataset | Brownfield land | no fact link |
| Organisation | London Borough of Hackney | no fact link |
| Start date | 2017-12-20 | Facts about Start date |
| End date | Facts about End date | |
| Entry date | 2017-12-20 | Facts about Entry date |
| Typology | geography | no fact link |
| Point |
POINT (-0.34832 51.506678)
|
Facts about Point |
| Notes | Permission PP/2012/4008 relates to phases S2 and S3 which in total will provide 306 new residential units. A total of 92 units have been completed in phase S2. A further 214 units are proposed in pha | Facts about Notes |
| Hectares | 2.48 | Facts about Hectares |
| Site address | OIS8c St Bernard's Hospital Phase S3 | Facts about Site address |
| Site plan url | http://maps.ealing.gov.uk/map/Aurora.svc/run?script=%5cAurora%5cBrownfield_Register_Zoom.AuroraScript%24&nocache=2087154948&resize=always&x= | Facts about Site plan url |
| Ownership status | not-owned-by-a-public-authority | Facts about Ownership status |
| Planning permission date | 2013-07-22 | Facts about Planning permission date |
| Planning permission type | full-planning-permission | Facts about Planning permission type |
| Planning permission status | permissioned | Facts about Planning permission status |
| Planning permission history | https://pam.ealing.gov.uk/online-applications/applicationDetails.do?activeTab=documents&keyVal=ZZZW6P | Facts about Planning permission history |
Available Code Snippets:
{
"entry-date": "2017-12-20",
"start-date": "2017-12-20",
"end-date": "",
"entity": 1744125,
"name": "OIS8c",
"dataset": "brownfield-land",
"typology": "geography",
"reference": "OIS8c",
"prefix": "brownfield-land",
"organisation-entity": 163,
"geometry": "",
"point": "POINT (-0.34832 51.506678)",
"quality": "some",
"notes": "Permission PP/2012/4008 relates to phases S2 and S3 which in total will provide 306 new residential units. A total of 92 units have been completed in phase S2. A further 214 units are proposed in pha",
"hectares": "2.48",
"site-address": "OIS8c St Bernard's Hospital Phase S3",
"site-plan-url": "http://maps.ealing.gov.uk/map/Aurora.svc/run?script=%5cAurora%5cBrownfield_Register_Zoom.AuroraScript%24&nocache=2087154948&resize=always&x=",
"ownership-status": "not-owned-by-a-public-authority",
"planning-permission-date": "2013-07-22",
"planning-permission-type": "full-planning-permission",
"planning-permission-status": "permissioned",
"planning-permission-history": "https://pam.ealing.gov.uk/online-applications/applicationDetails.do?activeTab=documents&keyVal=ZZZW6P"
}
Loading...
© Crown copyright and database right 2026
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.