Geographical area
About this entity
| Fact links | ||
|---|---|---|
| CURIE | brownfield-land:4608a | no fact link |
| Prefix | brownfield-land | Facts about Prefix |
| Reference | 4608a | Facts about Reference |
| Name | 4608a | Facts about Name |
| Quality | Authoritative: We have some data from the authoritative source | no fact link |
| Dataset | Brownfield land | no fact link |
| Organisation | Northumberland County Council | no fact link |
| Start date | 2017-12-17 | Facts about Start date |
| End date | Facts about End date | |
| Entry date | 2024-12-17 | Facts about Entry date |
| Typology | geography | no fact link |
| Point |
POINT (-1.551594 55.068155)
|
Facts about Point |
| Notes | Small site that formed a part of the Seghill Colliery complex, although this particular parcel has been vacant for many years. There is a complex planning history to this site, with proposals for redevelopment going back a number of years. An initial outline consent for 5 dwellings (relating to plots 2 to 6) was approved in 2014 (11/00791/OUT). Construction commenced without detailed permission having been secured, with plot-3 being complete and another unit under-construction, before development was halted. A retrospective reserved matters was finally approved in October 2019 (19/01893/REM). At present, 2 units have been completed (plot-3 and plot-4) and 3 dwellings remain outstanding (plots-2, -5 & -6). Of the latter, plot-5 and plot-6 have commenced. However, it is understood that construction works have stalled. Whilst the permission will not lapse, and the theoretical capacity from the extant planning permission remains, the future delivery of all outstanding units is currently discounted. If/when new information becomes available to suggest a change to this position, then deliverability can be appraised. NB - this is part of a wider scheme with this scheme adjacent to 3 further plots benefitting from individual full permissions (known as plots-1, -7 & -8), which are identified as separate but associated small sites in the SHLAA (4608b, 4608c, 4608d). | Facts about Notes |
| Hectares | 0.34 | Facts about Hectares |
| Site address | Northern Yard, Pitt Lane, Seghill | Facts about Site address |
| Site plan url | https://experience.arcgis.com/experience/fa5b04e3dc8a4e439eb393d0ca64b0d8/ | Facts about Site plan url |
| Ownership status | not-owned-by-a-public-authority | Facts about Ownership status |
| Maximum net dwellings | 3 | Facts about Maximum net dwellings |
| Minimum net dwellings | 0 | Facts about Minimum net dwellings |
| Planning permission date | 2019-10-22 | Facts about Planning permission date |
| Planning permission type | full-planning-permission | Facts about Planning permission type |
| Planning permission status | permissioned | Facts about Planning permission status |
| Planning permission history | https://publicaccess.northumberland.gov.uk/online-applications/applicationDetails.do?keyVal=PSZB8TQS0GN00&activeTab=summary | Facts about Planning permission history |
Available Code Snippets:
{
"entry-date": "2024-12-17",
"start-date": "2017-12-17",
"end-date": "",
"entity": 1735081,
"name": "4608a",
"dataset": "brownfield-land",
"typology": "geography",
"reference": "4608a",
"prefix": "brownfield-land",
"organisation-entity": 220,
"geometry": "",
"point": "POINT (-1.551594 55.068155)",
"quality": "authoritative",
"notes": "Small site that formed a part of the Seghill Colliery complex, although this particular parcel has been vacant for many years. There is a complex planning history to this site, with proposals for redevelopment going back a number of years. An initial outline consent for 5 dwellings (relating to plots 2 to 6) was approved in 2014 (11/00791/OUT). Construction commenced without detailed permission having been secured, with plot-3 being complete and another unit under-construction, before development was halted. A retrospective reserved matters was finally approved in October 2019 (19/01893/REM). At present, 2 units have been completed (plot-3 and plot-4) and 3 dwellings remain outstanding (plots-2, -5 & -6). Of the latter, plot-5 and plot-6 have commenced. However, it is understood that construction works have stalled. Whilst the permission will not lapse, and the theoretical capacity from the extant planning permission remains, the future delivery of all outstanding units is currently discounted. If/when new information becomes available to suggest a change to this position, then deliverability can be appraised. NB - this is part of a wider scheme with this scheme adjacent to 3 further plots benefitting from individual full permissions (known as plots-1, -7 & -8), which are identified as separate but associated small sites in the SHLAA (4608b, 4608c, 4608d).",
"hectares": "0.34",
"site-address": "Northern Yard, Pitt Lane, Seghill",
"site-plan-url": "https://experience.arcgis.com/experience/fa5b04e3dc8a4e439eb393d0ca64b0d8/",
"ownership-status": "not-owned-by-a-public-authority",
"maximum-net-dwellings": "3",
"minimum-net-dwellings": "0",
"planning-permission-date": "2019-10-22",
"planning-permission-type": "full-planning-permission",
"planning-permission-status": "permissioned",
"planning-permission-history": "https://publicaccess.northumberland.gov.uk/online-applications/applicationDetails.do?keyVal=PSZB8TQS0GN00&activeTab=summary"
}
Loading...
© Crown copyright and database right 2026
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.