Brownfield land
SLAA/99/1
Field | Value | Fact links |
---|---|---|
Reference | SLAA/99/1 | Facts |
Prefix | brownfield-land | Facts |
Name | SLAA/99/1 | Facts |
Dataset | Brownfield land | no fact link |
Organisation | Runnymede Borough Council | no fact link |
Start date | 2018-02-02 | no fact link |
End date | no fact link | |
Entry date | 2021-02-05 | Facts |
Typology | geography | no fact link |
Point |
POINT (-0.59206 51.382974)
|
Facts |
Notes | Site north of M3 only: RU.13/0856 (Hybrid), Phase 2 RM: RU.17/1295, RU.17/1307 & RU.17/1191. Register entry contains dwellings remaining to be completed.. Hybrid planning application for the demolition of existing buildings and redevelopment of the site to provide; up to 79,025sqm (GEA) of Class B1 employment uses (including parking); up to 36,000sqm (GEA) of sui generis Data Centres use (including ancillary facilities and parking); up to 200 dwellings, including a detailed first phase comprising 108 dwellings (comprising 13 x two bed, 26 x three bed, 21 x four bed and 13 x five bed dwellings; 8 x one bed apartments and 23 x two bed apartments; and 2 x one bed FOGs and 2 x two bed FOGs); roadways driveways and pavements; fencing and walling; up to 6,300sqm (GEA) of ancillary uses, including Class A1 - A5 uses (i.e. retail uses, cafe/restaurants and a public house up to 1,550sqm GEA), Class D1 uses (i.e. childcare facilities up to 600sqm GEA); Class D2 uses (i.e. Health and Leisure (up to 1900sqm GEA); the creation of Publicly Accessible Open Space (PAOS), ecological habitats, general amenity areas ( including informal and formal open spaces), equipped play areas and landscaped areas; new vehicular accesses from the existing public highway network; vehicle and cycle parking; bin stores; landscape compound; car parking (for railway station); electricity sub-stations; lighting; drainage and associated infrastructure works, including sustainable drainage systems (SUDS); a foul pumping station; an acoustic fence and associated engineering and service operations | Facts |
Hectares | 28 | Facts |
Deliverable | yes | Facts |
Site address | Longcross Garden Village (northern site) | Facts |
Site plan url | http://maps.runnymede.gov.uk/website/maps/index.html | Facts |
Ownership status | not-owned-by-a-public-authority | Facts |
Maximum net dwellings | 200 | Facts |
Minimum net dwellings | 108 | Facts |
Planning permission date | 2014-08-12 | Facts |
Planning permission type | hybrid application | Facts |
Planning permission status | permissioned | Facts |
Planning permission history | http://maps.runnymede.gov.uk/website/maps/index.html | Facts |
Available Code Snippets:
{
"reference": "SLAA/99/1",
"prefix": "brownfield-land",
"name": "SLAA/99/1",
"dataset": "brownfield-land",
"organisation-entity": "274",
"start-date": "2018-02-02",
"end-date": "",
"entry-date": "2021-02-05",
"typology": "geography",
"geometry": "",
"point": "POINT (-0.59206 51.382974)",
"entity": 1732831,
"notes": "Site north of M3 only: RU.13/0856 (Hybrid), Phase 2 RM: RU.17/1295, RU.17/1307 & RU.17/1191. Register entry contains dwellings remaining to be completed.. Hybrid planning application for the demolition of existing buildings and redevelopment of the site to provide; up to 79,025sqm (GEA) of Class B1 employment uses (including parking); up to 36,000sqm (GEA) of sui generis Data Centres use (including ancillary facilities and parking); up to 200 dwellings, including a detailed first phase comprising 108 dwellings (comprising 13 x two bed, 26 x three bed, 21 x four bed and 13 x five bed dwellings; 8 x one bed apartments and 23 x two bed apartments; and 2 x one bed FOGs and 2 x two bed FOGs); roadways driveways and pavements; fencing and walling; up to 6,300sqm (GEA) of ancillary uses, including Class A1 - A5 uses (i.e. retail uses, cafe/restaurants and a public house up to 1,550sqm GEA), Class D1 uses (i.e. childcare facilities up to 600sqm GEA); Class D2 uses (i.e. Health and Leisure (up to 1900sqm GEA); the creation of Publicly Accessible Open Space (PAOS), ecological habitats, general amenity areas ( including informal and formal open spaces), equipped play areas and landscaped areas; new vehicular accesses from the existing public highway network; vehicle and cycle parking; bin stores; landscape compound; car parking (for railway station); electricity sub-stations; lighting; drainage and associated infrastructure works, including sustainable drainage systems (SUDS); a foul pumping station; an acoustic fence and associated engineering and service operations",
"hectares": "28",
"deliverable": "yes",
"site-address": "Longcross Garden Village (northern site)",
"site-plan-url": "http://maps.runnymede.gov.uk/website/maps/index.html",
"ownership-status": "not-owned-by-a-public-authority",
"maximum-net-dwellings": "200",
"minimum-net-dwellings": "108",
"planning-permission-date": "2014-08-12",
"planning-permission-type": "hybrid application",
"planning-permission-status": "permissioned",
"planning-permission-history": "http://maps.runnymede.gov.uk/website/maps/index.html"
}
Loading...
© Crown copyright and database right 2025
Licensed under the Open Government Licence v.3.0.
Geographical area
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.