Brownfield land
ROS02
Geographical area
About this entity
| Fact links | ||
|---|---|---|
| CURIE | brownfield-land:ROS02 | no fact link |
| Prefix | brownfield-land | Facts about Prefix |
| Reference | ROS02 | Facts about Reference |
| Name | ROS02 | Facts about Name |
| Quality | Authoritative: We have some data from the authoritative source | no fact link |
| Dataset | Brownfield land | no fact link |
| Organisation | Doncaster Metropolitan Borough Council | no fact link |
| Start date | 2019-12-31 | Facts about Start date |
| End date | Facts about End date | |
| Entry date | 2021-12-31 | Facts about Entry date |
| Typology | geography | no fact link |
| Point |
POINT (-1.094537 53.475407)
|
Facts about Point |
| Notes | Site allocated as part of the Local Plan.. The site extends to 14.5 hectares and consists of part of the former colliery site and spoil tip and is brownfield therefore. To the north of the site is the wider former colliery site which is now under construction for housing. The new IPort strategic distribution facility is under construction to the west of the site and further colliery restoration to the south. There is dense woodland (Holmes Carr) to the east of the site beyond which are further residential uses.. https://www.doncaster.gov.uk/services/planning/local-plan | Facts about Notes |
| Hectares | 14.501 | Facts about Hectares |
| Site address | Former Rossington Colliery (south), Rossington | Facts about Site address |
| Site plan url | https://maps.doncaster.gov.uk/portal/apps/webappviewer/index.html?id=f5868dde541f417eb9ee83c34222b7bf | Facts about Site plan url |
| Ownership status | not-owned-by-a-public-authority | Facts about Ownership status |
| Planning permission status | not-permissioned | Facts about Planning permission status |
Available Code Snippets:
{
"entry-date": "2021-12-31",
"start-date": "2019-12-31",
"end-date": "",
"entity": 1730205,
"name": "ROS02",
"dataset": "brownfield-land",
"typology": "geography",
"reference": "ROS02",
"prefix": "brownfield-land",
"organisation-entity": 109,
"geometry": "",
"point": "POINT (-1.094537 53.475407)",
"quality": "authoritative",
"notes": "Site allocated as part of the Local Plan.. The site extends to 14.5 hectares and consists of part of the former colliery site and spoil tip and is brownfield therefore. To the north of the site is the wider former colliery site which is now under construction for housing. The new IPort strategic distribution facility is under construction to the west of the site and further colliery restoration to the south. There is dense woodland (Holmes Carr) to the east of the site beyond which are further residential uses.. https://www.doncaster.gov.uk/services/planning/local-plan",
"hectares": "14.501",
"site-address": "Former Rossington Colliery (south), Rossington",
"site-plan-url": "https://maps.doncaster.gov.uk/portal/apps/webappviewer/index.html?id=f5868dde541f417eb9ee83c34222b7bf",
"ownership-status": "not-owned-by-a-public-authority",
"planning-permission-status": "not-permissioned"
}
Loading...
© Crown copyright and database right 2026
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.