Brownfield land
ROS02
Field | Value | Fact links |
---|---|---|
Reference | ROS02 | Facts |
Prefix | brownfield-land | Facts |
Name | ROS02 | Facts |
Dataset | Brownfield land | no fact link |
Organisation | Doncaster Metropolitan Borough Council | no fact link |
Start date | 2019-12-31 | no fact link |
End date | no fact link | |
Entry date | 2021-12-31 | Facts |
Typology | geography | no fact link |
Point |
POINT (-1.094537 53.475407)
|
Facts |
Notes | Site allocated as part of the Local Plan.. The site extends to 14.5 hectares and consists of part of the former colliery site and spoil tip and is brownfield therefore. To the north of the site is the wider former colliery site which is now under construction for housing. The new IPort strategic distribution facility is under construction to the west of the site and further colliery restoration to the south. There is dense woodland (Holmes Carr) to the east of the site beyond which are further residential uses.. https://www.doncaster.gov.uk/services/planning/local-plan | Facts |
Hectares | 14.501 | Facts |
Site address | Former Rossington Colliery (south), Rossington | Facts |
Site plan url | https://maps.doncaster.gov.uk/portal/apps/webappviewer/index.html?id=f5868dde541f417eb9ee83c34222b7bf | Facts |
Ownership status | not-owned-by-a-public-authority | Facts |
Maximum net dwellings | 349 | Facts |
Planning permission status | not-permissioned | Facts |
Available Code Snippets:
{
"reference": "ROS02",
"prefix": "brownfield-land",
"name": "ROS02",
"dataset": "brownfield-land",
"organisation-entity": "109",
"start-date": "2019-12-31",
"end-date": "",
"entry-date": "2021-12-31",
"typology": "geography",
"geometry": "",
"point": "POINT (-1.094537 53.475407)",
"entity": 1730205,
"notes": "Site allocated as part of the Local Plan.. The site extends to 14.5 hectares and consists of part of the former colliery site and spoil tip and is brownfield therefore. To the north of the site is the wider former colliery site which is now under construction for housing. The new IPort strategic distribution facility is under construction to the west of the site and further colliery restoration to the south. There is dense woodland (Holmes Carr) to the east of the site beyond which are further residential uses.. https://www.doncaster.gov.uk/services/planning/local-plan",
"hectares": "14.501",
"site-address": "Former Rossington Colliery (south), Rossington",
"site-plan-url": "https://maps.doncaster.gov.uk/portal/apps/webappviewer/index.html?id=f5868dde541f417eb9ee83c34222b7bf",
"ownership-status": "not-owned-by-a-public-authority",
"maximum-net-dwellings": "349",
"planning-permission-status": "not-permissioned"
}
Loading...
© Crown copyright and database right 2025
Licensed under the Open Government Licence v.3.0.
Geographical area
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.