Skip to main content

This is a new service - your feedback (opens in new tab) will help us to improve it.

Brownfield land

Map ref 57 LP8 BRA18 The Peel Centre and The Point (Submission Local Plan)

Geographical area

About this entity

Fact links
CURIE brownfield-land:Map ref 57 LP8 BRA18 The Peel Centre and The Point (Submission Local Plan) no fact link
Prefix brownfield-land Facts about Prefix
Reference Map ref 57 LP8 BRA18 The Peel Centre and The Point (Submission Local Plan) Facts about Reference
Name Map ref 57 LP8 BRA18 The Peel Centre and The Point (Submission Local Plan) Facts about Name
Quality Authoritative: We have some data from the authoritative source no fact link
Dataset Brownfield land no fact link
Organisation Bracknell Forest Council no fact link
Start date 2021-12-29 Facts about Start date
End date Facts about End date
Entry date 2022-12-01 Facts about Entry date
Typology geography no fact link
Point POINT (-0.756748 51.414625) Facts about Point
Notes Submission Local Plan Facts about Notes
Hectares 6.54 Facts about Hectares
Deliverable yes Facts about Deliverable
Site address The Peel Centre and The Point, Skimped Hill Lane, Bracknell Facts about Site address
Site plan url https://consult.bracknell-forest.gov.uk/file/5954421 Facts about Site plan url
Ownership status not-owned-by-a-public-authority Facts about Ownership status
Maximum net dwellings 900 Facts about Maximum net dwellings
Minimum net dwellings 900 Facts about Minimum net dwellings
Planning permission status not-permissioned Facts about Planning permission status
Planning permission history https://consult.bracknell-forest.gov.uk/file/5519138 Facts about Planning permission history

Available Code Snippets:

{
        "entry-date": "2022-12-01",
        "start-date": "2021-12-29",
        "end-date": "",
        "entity": 1729847,
        "name": "Map ref 57 LP8 BRA18 The Peel Centre and The Point (Submission Local Plan)",
        "dataset": "brownfield-land",
        "typology": "geography",
        "reference": "Map ref 57 LP8 BRA18 The Peel Centre and The Point (Submission Local Plan)",
        "prefix": "brownfield-land",
        "organisation-entity": 57,
        "geometry": "",
        "point": "POINT (-0.756748 51.414625)",
        "quality": "authoritative",
        "notes": "Submission Local Plan",
        "hectares": "6.54",
        "deliverable": "yes",
        "site-address": "The Peel Centre and The Point, Skimped Hill Lane, Bracknell",
        "site-plan-url": "https://consult.bracknell-forest.gov.uk/file/5954421",
        "ownership-status": "not-owned-by-a-public-authority",
        "maximum-net-dwellings": "900",
        "minimum-net-dwellings": "900",
        "planning-permission-status": "not-permissioned",
        "planning-permission-history": "https://consult.bracknell-forest.gov.uk/file/5519138"
    }
Loading...

© Crown copyright and database right 2026

Licensed under the Open Government Licence v.3.0.


Help improve this data

Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.