Brownfield land
3088
| Field | Value | Fact links |
|---|---|---|
| CURIE | brownfield-land:3088 | no fact link |
| Prefix | brownfield-land | Facts |
| Reference | 3088 | Facts |
| Name | 3088 | Facts |
| Quality | Authoritative: We have some data from the authoritative source | no fact link |
| Dataset | Brownfield land | no fact link |
| Organisation | Northumberland County Council | no fact link |
| Start date | 2019-11-19 | Facts |
| End date | Facts | |
| Entry date | 2020-12-17 | Facts |
| Typology | geography | no fact link |
| Point |
POINT (-1.69295 55.1698)
|
Facts |
| Notes | Operational telephone exchange, consisting of the main building and associated land. It has been suggested in the past that the site may become surplus to requirements in future. However, the site remains operational and it has recently been confirmed that it will not be available for redevelopment in the short-term. Any timescale for this change is dependent on operational and business needs of BT. This position could change in the longer-term but no residential development is forecast within the plan period at present. | Facts |
| Hectares | 0.37 | Facts |
| Site address | Telephone Exchange, Morpeth | Facts |
| Site plan url | https://experience.arcgis.com/experience/fa5b04e3dc8a4e439eb393d0ca64b0d8/ | Facts |
| Ownership status | not-owned-by-a-public-authority | Facts |
| Maximum net dwellings | 15 | Facts |
| Minimum net dwellings | 14 | Facts |
| Planning permission status | not-permissioned | Facts |
Available Code Snippets:
{
"entry-date": "2020-12-17",
"start-date": "2019-11-19",
"end-date": "",
"entity": 1716333,
"name": "3088",
"dataset": "brownfield-land",
"typology": "geography",
"reference": "3088",
"prefix": "brownfield-land",
"organisation-entity": "220",
"geometry": "",
"point": "POINT (-1.69295 55.1698)",
"quality": "authoritative",
"notes": "Operational telephone exchange, consisting of the main building and associated land. It has been suggested in the past that the site may become surplus to requirements in future. However, the site remains operational and it has recently been confirmed that it will not be available for redevelopment in the short-term. Any timescale for this change is dependent on operational and business needs of BT. This position could change in the longer-term but no residential development is forecast within the plan period at present.",
"hectares": "0.37",
"site-address": "Telephone Exchange, Morpeth",
"site-plan-url": "https://experience.arcgis.com/experience/fa5b04e3dc8a4e439eb393d0ca64b0d8/",
"ownership-status": "not-owned-by-a-public-authority",
"maximum-net-dwellings": "15",
"minimum-net-dwellings": "14",
"planning-permission-status": "not-permissioned"
}
Loading...
© Crown copyright and database right 2026
Licensed under the Open Government Licence v.3.0.
Geographical area
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.