Brownfield land
8074
Geographical area
About this entity
| Fact links | ||
|---|---|---|
| CURIE | brownfield-land:8074 | no fact link |
| Prefix | brownfield-land | Facts about Prefix |
| Reference | 8074 | Facts about Reference |
| Name | 8074 | Facts about Name |
| Quality | Authoritative: We have some data from the authoritative source | no fact link |
| Dataset | Brownfield land | no fact link |
| Organisation | Northumberland County Council | no fact link |
| Start date | 2016-06-30 | Facts about Start date |
| End date | Facts about End date | |
| Entry date | 2025-12-22 | Facts about Entry date |
| Typology | geography | no fact link |
| Point |
POINT (-2.019747 55.767188)
|
Facts about Point |
| Notes | Site occupied by an existing residential care home and associated vacant land. Situated at the edge of Berwick, the surrounding land is mostly industrial and commercial in nature. Interface with the surrounding uses will have to be carefully considered in the design of a housing scheme. The site has been identified for redevelopment for a number of years. Demolition of the existing care home may be necessary prior to redevelopment, depending on the nature of scheme proposed. Previous proposals have included the provision of a new care home to replace the existing facility. The intention of this would be to renew the outdated social housing stock with more suitable accommodation. An initial scheme of 45 residential units was approved in outline in 2015 (11/03407/OUT). This also included consent for a 60-bed care home (C2 use). The units in the latter were not to be self-contained flats, so no net gain to stock would result from this aspect. However, this permission lapsed due to non-implementation. More recently, developer interest has been revived and a new application was approved for development of 58 homes in 2023 (21/04453/FUL). All 58 units are affordable homes, to be managed by Bernicia. Site works commenced in 2024. The whole scheme is set to be delivered in the next five years. | Facts about Notes |
| Hectares | 2 | Facts about Hectares |
| Deliverable | yes | Facts about Deliverable |
| Site address | Seton Hall, Berwick-upon-Tweed | Facts about Site address |
| Site plan url | https://experience.arcgis.com/experience/fa5b04e3dc8a4e439eb393d0ca64b0d8/ | Facts about Site plan url |
| Ownership status | not-owned-by-a-public-authority | Facts about Ownership status |
| Maximum net dwellings | 56 | Facts about Maximum net dwellings |
| Minimum net dwellings | 56 | Facts about Minimum net dwellings |
| Planning permission date | 2023-09-25 | Facts about Planning permission date |
| Planning permission type | full-planning-permission | Facts about Planning permission type |
| Planning permission status | permissioned | Facts about Planning permission status |
| Planning permission history | https://publicaccess.northumberland.gov.uk/online-applications/propertyDetails.do?activeTab=relatedCases&keyVal=002YRJTGLI000 | Facts about Planning permission history |
Available Code Snippets:
{
"entry-date": "2025-12-22",
"start-date": "2016-06-30",
"end-date": "",
"entity": 1716295,
"name": "8074",
"dataset": "brownfield-land",
"typology": "geography",
"reference": "8074",
"prefix": "brownfield-land",
"organisation-entity": 220,
"geometry": "",
"point": "POINT (-2.019747 55.767188)",
"quality": "authoritative",
"notes": "Site occupied by an existing residential care home and associated vacant land. Situated at the edge of Berwick, the surrounding land is mostly industrial and commercial in nature. Interface with the surrounding uses will have to be carefully considered in the design of a housing scheme. The site has been identified for redevelopment for a number of years. Demolition of the existing care home may be necessary prior to redevelopment, depending on the nature of scheme proposed. Previous proposals have included the provision of a new care home to replace the existing facility. The intention of this would be to renew the outdated social housing stock with more suitable accommodation. An initial scheme of 45 residential units was approved in outline in 2015 (11/03407/OUT). This also included consent for a 60-bed care home (C2 use). The units in the latter were not to be self-contained flats, so no net gain to stock would result from this aspect. However, this permission lapsed due to non-implementation. More recently, developer interest has been revived and a new application was approved for development of 58 homes in 2023 (21/04453/FUL). All 58 units are affordable homes, to be managed by Bernicia. Site works commenced in 2024. The whole scheme is set to be delivered in the next five years.",
"hectares": "2",
"deliverable": "yes",
"site-address": "Seton Hall, Berwick-upon-Tweed",
"site-plan-url": "https://experience.arcgis.com/experience/fa5b04e3dc8a4e439eb393d0ca64b0d8/",
"ownership-status": "not-owned-by-a-public-authority",
"maximum-net-dwellings": "56",
"minimum-net-dwellings": "56",
"planning-permission-date": "2023-09-25",
"planning-permission-type": "full-planning-permission",
"planning-permission-status": "permissioned",
"planning-permission-history": "https://publicaccess.northumberland.gov.uk/online-applications/propertyDetails.do?activeTab=relatedCases&keyVal=002YRJTGLI000"
}
Loading...
© Crown copyright and database right 2026
Licensed under the Open Government Licence v.3.0.
Help improve this data
Give feedback on this dataset, or email your questions and corrections to digitalland@communities.gov.uk.